Assembly Bill No. 699–Committee on Ways and Means
May 29, 1999
____________
Referred to Committee on Ways and Means
SUMMARY—Authorizes and provides funding for certain projects of capital improvement. (BDR S-1779)
FISCAL NOTE: Effect on Local Government: No.
Effect on the State or on Industrial Insurance: Contains Appropriation included in Executive Budget.
~
EXPLANATION – Matter in
bolded italics is new; matter between brackets
THE PEOPLE OF THE STATE OF NEVADA, REPRESENTED IN SENATE AND ASSEMBLY, DO ENACT AS FOLLOWS:
1-1
Section 1. The State Board of Finance shall issue general obligation1-2
bonds of the State of Nevada in the face amount of not more than1-3
$157,992,540 for the capital improvements summarized in this section.1-4
This amount is allocated to projects numbered and described in the1-5
executive budget for the fiscal years 1999-2000 and 2000-2001 or1-6
otherwise described as follows:1-7
Description Project No. Amount1-8
1. Capital improvements for the Department1-10
Men’s Prison No. 7 (Cold Creek State1-11
Prison), Phase II 99-C1 $34,705,8511-12
Sewage plant improvements at SNCC,1-13
LCC, PCC and ECC 99-M27 $616,3882-1
Replace fire hydrants, Southern2-2
Nevada Correctional Center 99-M28 $28,4952-3
Repair 21 housing unit wing gates,2-4
Southern Desert Correctional Center 99-M29 $518,1592-5
Improve shower stalls in housing units,2-6
Nevada State Prison 99-M30 $198,9592-7
Emergency generator replacement,2-8
Southern Desert Correctional Center 99-M32 $361,7992-9
Replace control panel in unit 7, Northern2-10
Nevada Correctional Center 99-M34L $423,9072-11
2. Capital improvements for the Office of the2-12
Military:2-13
New supply administration facility,2-14
Carson City 99-C3 $3,491,3072-15
Enclose pavilion at Veteran’s Cemetery,2-16
Fernley 99-C9 $247,0812-17
3. Capital improvements for the University and2-18
Community College System of Nevada:2-19
Lied Library Furnishings, UNLV 99-C11 $7,469,0112-20
Law School Renovation, UNLV 99-C12 $15,606,4242-21
Redfield campus, phase I, UNR 99-C13 $5,172,9572-22
Science building on West Charleston2-23
campus, CCSN 99-C14 $17,241,8212-24
High-Tech Center, GBC 99-C15 $5,124,6002-25
Student development center, TMCC 99-C16 $5,003,0222-26
Library and student center, WNCC 99-C17 $6,176,5142-27
Wright Hall phase I advance planning,2-28
UNLV 99-C23L $524,6792-29
High-Tech learning center, Green Valley,2-30
CCSN 99-C28L $5,000,0002-31
Medical school learning resource center,2-32
UNR 99-C29L $4,000,0002-33
High-Tech learning center, TMCC 99-C37L $5,000,0002-34
Southern Nevada science center, DRI 99-C38L $1,500,0002-35
Campus improvements, System 99-U1 $100,0002-36
Campus improvements, UNLV 99-U2 $2,975,9762-37
Campus improvements, UNR 99-U3 $4,109,8232-38
Campus improvements, CCSN 99-U4 $1,062,9652-39
Campus improvements, DRI 99-U5 $354,4122-40
Campus improvements, GBC 99-U6 $354,4122-41
Campus improvements, TMCC 99-U7 $688,0002-42
Campus improvements, WNCC 99-U8 $354,4123-1
4. Capital improvements for the Department of Business and 3-2 Industry:3-3
Las Vegas building addition for Division3-4
of Agriculture, Las Vegas 99-C5 $287,5853-5
5. Capital improvements for the State3-6
Department of Conservation and Natural3-7
Resources:3-8
Expand shops and warehouses at the3-9
Tonopah, Ely and Indian Springs3-10
conservation camps 99-C6 $484,6983-11
Region 2 office, shop and storage3-12
complex for the Wildlife and State3-13
Parks divisions, Elko 99-C18 $1,154,5863-14
Dispatch center expansion and remodel,3-15
Division of Forestry, Minden 99-C19 $139,1793-16
6. Capital improvements for the Department of3-17
Human Resources:3-18
SNAMHS, advance planning for3-19
psychiatric emergency crisis center 99-C7 $288,5003-20
New mental health hospital, NMHI 99-C21 $10,030,1323-21
Provide second exit from dormitories and3-22
install fire sprinklers at Caliente3-23
Youth Center 99-M1 $232,9603-24
HVAC systems renovation,3-25
SNMRS/DRC, Las Vegas 99-M8 $854,9013-26
Replace floor and wall coverings,3-27
SNAMHS, Las Vegas 99-M9 $62,2883-28
Replace fencing and gates, SNAMHS,3-30
Temperature control system upgrade,3-31
SNAMHS, Las Vegas 99-M11 $206,7563-32
Exterior lighting upgrade, SNAMHS,3-34
Replace exterior wood doors for3-35
administration building, SNAMHS,3-37
Replace HVAC units in buildings 2A, 7,3-38
8A, 8B and 8C, NMHI, Reno 99-M15 $101,6783-39
Domestic water heater replacement in3-40
building 8, NMHI, Reno 99-M16 $46,2233-41
Upgrade restroom fixtures in buildings 73-42
and 8, SNCAS, Las Vegas 99-M17 $68,1484-1
Exterior safety lighting and pool4-2
cover, SNCAS, Las Vegas 99-M18 $111,8094-3
HVAC system renovation in building 15,4-4
SNCAS, Las Vegas 99-M19 $68,3044-5
Replace windows in building 8, SNCAS,4-6
Las Vegas 99-M20 $41,2174-7
Demolition of bowling alley at NNCH,4-8
Carson City 99-M21 $32,1374-9
Repair/remodel multipurpose building4-10
and replace ceiling and wall covers in4-11
the gymnasium, NYTC, Elko 99-M22 $319,7954-12
Install back-flow preventors, NMHI,4-13
Sparks 99-M24 $37,6134-14
7. Capital improvements for the Department of4-15
Museums, Library and Arts:4-16
Remodel old FIB building for Museums,4-17
Carson City 99-C10 $286,0174-18
8. Capital improvements for the Department4-20
Remodel Carson City Courthouse for the4-21
Office of the Attorney General 99-C4 $1,727,3714-22
Co-op parking with Carson City 99-C20 $330,9004-23
Fire alarm system upgrade and install fire4-24
sprinklers at Belrose Building,4-26
Upgrade Marlette water treatment plant,4-27
Carson City 99-M3 $60,8104-28
Heating system replacement in buildings4-29
12, 13, 17, 18, 89 and 160 at Stewart4-30
Complex, Carson City 99-M4 $347,8294-31
Sewer line upgrades, Phase II at Stewart4-32
Complex, Carson City 99-M5 $177,7624-33
Boiler replacement, Special Children’s4-34
Clinic, Reno 99-M6 $24,5174-35
Sewer line upgrades, Phase II at Clear4-36
Creek Facility, Carson City 99-M7 $193,4034-37
Statewide roofing program 99-S1 $1,753,8544-38
Statewide ADA program 99-S2 $1,954,5714-39
Statewide fire sprinkler program 99-S3 $366,8664-40
Advance planning for 2001 CIP program 99-S4A $50,5134-41
Advance planning through construction4-42
documents for addition and remodel4-43
of Special Children’s Clinic, Reno 99-S4B $111,0975-1
Advance planning through5-2
construction documents for central5-3
administration building, MH/MR, Las5-4
Vegas 99-S4C $366,5005-5
Advance planning through construction5-6
documents for records center in5-7
southern Nevada, MLA 99-S4D $155,1925-8
Advance planning through construction5-9
documents for visitor’s center at5-10
Mormon Fort, Las Vegas 99-S4E $100,0005-11
Statewide paving 99-S5 $804,1175-12
Statewide asbestos, lead and indoor air5-13
quality program 99-S6 $1,314,2995-14
Statewide underground storage tank5-15
removal program 99-S7 $490,1095-16
9. Capital improvements for the Department5-18
Capitol Complex conduit system, phase5-19
II, Carson City 99-C8 $1,872,3955-20
Chiller replacement at computer facility,5-21
Carson City 99-M25 $291,4155-22
Upgrade building data systems/wiring for5-23
Capitol Complex and Sawyer5-24
Building, Carson City and Las Vegas 99-M26 $1,614,0285-25
Sec. 2. 1. The State Board of Finance shall issue 5-26 general obligation5-27
bonds of the State of Nevada in the face amount of not 5-28 more than $407,6495-29
for capital improvement project 99-C39L, various general 5-30 improvements at5-31
the Old Las Vegas Mormon Fort, Phase 1B.5-32
2. The proceeds of the bonds issued pursuant to this 5-33 section must be5-34
allocated to the State Department of Conservation and 5-35 Natural Resources.5-36
The State Department of Conservation and Natural 5-37 Resources shall5-38
administer the project.5-39
3. The Legislature finds and declares that the 5-40 issuance of bonds5-41
pursuant to this section is necessary for the protection and 5-42 preservation of5-43
the property of this state and for the purpose of obtaining 5-44 the benefits5-45
thereof, and constitutes an exercise of the authority 5-46 conferred by the second5-47
paragraph of section 3 of article 9 of the Constitution of the 5-48 State of5-49
Nevada.5-50
Sec. 3. Any remaining balance of the allocated 5-51 amounts authorized in5-52
sections 1 and 2 of this act must not be committed for 5-53 expenditure after5-54
June 30, 2003, and reverts to the bond interest and 5-55 redemption account in5-56
the consolidated bond interest and redemption fund as soon 5-57 as all payments5-58
of money committed have been made.6-1
Sec. 4. 1. 6-2 The State Controller may advance temporarily from 6-3 the6-4
state general fund, upon the approval of the Chief of the 6-5 Budget Division of6-6
the Department of Administration, to the State Public 6-7 Works Board or the6-8
State Department of Conservation and Natural Resources, 6-9 until the date on6-10
which bonds authorized by sections 1 and 2 of this act are 6-11 sold, amounts6-12
necessary to facilitate the start of the projects enumerated 6-13 in sections 1 and6-14
2 of this act. The State Controller shall not advance more 6-15 than the face6-16
amount of the bonds authorized to be issued. The advanced 6-17 amounts must6-18
be repaid immediately to the state general fund upon the 6-19 sale of the bonds.6-20
2. The Chief of the Budget Division of the 6-21 Department of6-22
Administration shall notify the State Controller and the 6-23 Fiscal Analysis6-24
Division of the Legislative Counsel Bureau of the approval 6-25 of an advance6-26
from the state general fund to the State Public Works 6-27 Board or the State6-28
Department of Conservation and Natural Resources 6-29 pursuant to subsection6-30
1.6-31
Sec. 5. 1. If the University and Community 6-32 College System of6-33
Nevada determines that all or a portion of the amounts 6-34 allocated pursuant6-35
to section 1 of this act for project 99-C16, student 6-36 development center,6-37
TMCC, are not needed to complete the project because 6-38 there is sufficient6-39
money available from other sources to complete the 6-40 project, the University6-41
and Community College System of Nevada shall notify the 6-42 State Public6-43
Works Board of that determination in writing. A 6-44 notification provided6-45
pursuant to this section must specify the amount allocated 6-46 pursuant to6-47
section 1 of this act for project 99-C16 that is not needed to 6-48 complete the6-49
project.6-50
2. Upon the receipt of notification from the 6-51 University and Community6-52
College System of Nevada that all or a portion of the 6-53 amounts allocated6-54
pursuant to section 1 of this act for project 99-C16, student 6-55 development6-56
center, TMCC, are not needed to complete the project, the 6-57 State Public6-58
Works Board shall transfer the amount specified in the 6-59 notification to6-60
support the Board in carrying out the program of capital 6-61 improvements6-62
summarized in this section. The amount specified in the 6-63 notification must6-64
be allocated in the manner prescribed in this section to 6-65 projects numbered6-66
and described in the executive budget for the fiscal years 6-67 1999-2000 and6-68
2000-2001 or otherwise described as follows:6-69
Description Project No. Allocation6-70
Capital improvements for the University and6-71
Community College System of Nevada:6-72
Addition to student services building,6-73
UNLV 99-C22L 80 percent7-1
High-Tech Center, Pahrump 99-C25L 10 percent7-2
Advance planning, Getchell library addition,7-3
UNR 99-S4GL 10 percent7-4
3. If the State Public Works Board makes a transfer 7-5 pursuant to7-6
subsection 2, the Manager of the State Public Works Board 7-7 shall notify:7-8
(a) The Budget Division of the Department of 7-9 Administration; and7-10
(b) The Legislature or, if the Legislature is not in 7-11 session, the Interim7-12
Finance Committee,7-13
of the transfer made pursuant to this section.7-14
4. Any remaining balance of the allocated amounts 7-15 authorized in7-16
subsection 2 must not be committed for expenditure after 7-17 June 30, 2003,7-18
and reverts to the bond interest and redemption account in 7-19 the consolidated7-20
bond interest and redemption fund as soon as all payments 7-21 of money7-22
committed have been made.7-23
Sec. 6. Commencing on July 1, 2001, the 7-24 Department of Information7-25
Technology shall repay in annual installments to the State 7-26 Treasurer for7-27
deposit to the bond interest and redemption account in the 7-28 consolidated7-29
bond interest and redemption fund the cost of project 99-7-30 C8, Capitol7-31
Complex conduit system, phase II, project 99-M25, chiller 7-32 replacement at7-33
computer facility, and project 99-M26, upgrade building 7-34 data7-35
systems/wiring for Capitol Complex and Sawyer Building. 7-36 Each installment7-37
must be equal to 5 percent of the total cost of the 7-38 completed project.7-39
Sec. 7. There is hereby appropriated from the state 7-40 highway fund to7-41
the State Public Works Board the sum of $11,796,898 to 7-42 support the Board7-43
in carrying out the program of capital improvements 7-44 summarized in this7-45
section. This amount is allocated to projects numbered and 7-46 described in the7-47
executive budget for the fiscal years 1999-2000 and 2000-7-48 2001 or7-49
otherwise described as follows:7-50
Description Project No. Amount7-51
1. New highway patrol building,7-53
2. Covered parking at highway patrol7-54
facility, Las Vegas 99-H2 $84,3507-55
3. Capitol Complex conduit system 99-C8 $279,4437-56
4. Upgrade building data systems/wiring 99-M26 $466,8587-57
5. Statewide paving 99-S5 $195,8837-58
Sec. 8. 1. The State Public Works Board shall 7-59 obtain approval for7-60
the siting and location of project 99-H1, new highway 7-61 patrol building in7-62
Las Vegas, from the Interim Finance Committee or the 7-63 Legislature if in7-64
session, before expending funding for the design of the 7-65 facility.8-1
2. The State 8-2 Public Works Board shall not expend the 8-3 $2,000,0008-4
designated for the costs of acquiring the property on which 8-5 the facility will8-6
be located for any purpose other than for the purpose of 8-7 acquiring the8-8
property on which the facility will be located.8-9
Sec. 9. 1. Except as otherwise provided in 8-10 subsection 2, any8-11
remaining balance of the appropriations made by section 7 8-12 of this act must8-13
not be committed for expenditure after June 30, 2003, and 8-14 reverts to the8-15
state highway fund as soon as all payments of money 8-16 committed have been8-17
made.8-18
2. Any remaining balance of the $2,000,000 that is 8-19 designated for the8-20
acquisition of the property on which project 99-H1, new 8-21 highway patrol8-22
building, Las Vegas, will be located must not be committed 8-23 for expenditure8-24
after June 30, 2001, and reverts to the state highway fund 8-25 as soon as all8-26
payments of money committed have been made.8-27
Sec. 10. The amounts appropriated pursuant to 8-28 section 7 of this act8-29
from the state highway fund must be allocated by the State 8-30 Controller as the8-31
money is required for the projects and must not be 8-32 transferred to the8-33
projects from the state highway fund until required to make 8-34 contract8-35
payments.8-36
Sec. 11. There is hereby appropriated from the 8-37 penalties and interest8-38
account maintained by the Employment Security Division 8-39 of the8-40
Department of Employment, Training and Rehabilitation to 8-41 the State Public8-42
Works Board the sum of $525,991 to support the Board in 8-43 carrying out the8-44
program of capital improvements summarized in this 8-45 section. This amount8-46
is allocated to projects numbered and described in the 8-47 executive budget for8-48
the fiscal years 1999-2000 and 2000-2001 or otherwise 8-49 described as8-50
follows:8-51
Description Project No. Amount8-52
1. Capitol Complex conduit system,8-53
Carson City 99-C8 $30,5238-54
2. Upgrade building data systems/wiring,8-55
Carson City 99-M26 $103,1368-56
3. Statewide roofing 99-S1 $392,3328-57
Sec. 12. The State Public Works Board shall 8-58 transfer the sum of $608-59
from the amount allocated pursuant to section 5 of chapter 8-60 613, Statutes of8-61
Nevada 1989, at pages 1372 and 1373, for project 89-39, 8-62 State Library,8-63
Carson City, to projects as authorized in section 18 of this 8-64 act.8-65
Sec. 13. The State Public Works Board shall 8-66 transfer the sum of8-67
$63,120 from the amounts allocated pursuant to section 4 8-68 of chapter 497,8-69
Statutes of Nevada 1991, at pages 1526, 1527 and 1528, 8-70 from the projects8-71
identified in this section to projects as authorized in section 8-72 18 of this act:9-1
Description Project No. Amount9-2
1. Chemistry/physics building, UNLV 91-D8 $3,8949-3
2. Architecture building, UNLV 91-D12 $32,2279-4
3. Regional medical facility 91-C12 $26,9999-5
Sec. 14. The State Public Works Board shall 9-6 transfer the sum of9-7
$21,450 from the interest on the proceeds of the bonds 9-8 issued pursuant to9-9
section 2 of chapter 718, Statutes of Nevada 1991, at page 9-10 2382, for project9-11
91-C15, classroom and office complex, UNLV, to projects 9-12 as authorized in9-13
section 18 of this act.9-14
Sec. 15. The State Public Works Board shall 9-15 transfer the sum of9-16
$514,246 from the amounts allocated or appropriated 9-17 pursuant to sections9-18
1, 7 and 14 of chapter 351, Statutes of Nevada 1993, at 9-19 pages 1126 to9-20
1131, inclusive, from the projects identified in this section 9-21 to projects as9-22
authorized in section 18 of this act:9-23
Description Project No. Amount9-24
1. Waterproof underground electrical9-25
system, SNCC 93-M5 $4809-26
2. Roofing, statewide 93-S1 $140,0009-27
3. Fire sprinklers 93-S3 $373,7669-28
Sec. 16. The State Public Works Board shall 9-29 transfer the sum of9-30
$638,827 from the amounts appropriated pursuant to 9-31 section 1 of chapter9-32
619, Statutes of Nevada 1995, at pages 2331 to 2335, 9-33 inclusive, from the9-34
projects identified in this section to projects as authorized 9-35 in section 18 of9-36
this act:9-37
Description Project No. Amount9-38
1. Renovate Kyle Canyon Fire Station #1,9-39
Division of Forestry 95-M19 $26,4999-40
2. Conservation camp shop expansion,9-41
Jean Conservation Camp, Division of9-42
Forestry 95-M22 $9,8049-43
3. Advance planning UNLV, Wright Hall9-44
renovation and addition, UNLV 95-S4B $3,7509-45
4. Advance design of UNLV library,9-46
UNLV 95-G2 $14,00010-1
5. Maintenance and renovation, NMHI,10-2
Sparks 95-M20 $90,56910-3
6. Lovelock Correctional Center, Phase II 95-C1 $359,86410-4
7. Replace/relocate generators, NSP,10-5
Carson City 95-M13 $22,48210-6
8. Americans with Disabilities Act,10-7
statewide 95-S2 $45,42910-8
9. Advance planning for 1997 CIP10-9
program, statewide 95-S4G $13,69910-10
10. Protect adobe at Lost City Museum,10-11
Overton 95-M29 $42,68310-12
11. Douglas county branch, WNCC 95-L14 $10,04810-13
Sec. 17. The State Public Works Board shall 10-14 transfer the sum of10-15
$2,820,326 from the amounts allocated or appropriated 10-16 pursuant to sections10-17
1, 10 and 17 of chapter 478, Statutes of Nevada 1997, at 10-18 pages 1827 to10-19
1835, inclusive, from the projects identified in this section 10-20 to projects as10-21
authorized in section 18 of this act:10-22
Description Project No. Amount10-23
1. Advanced planning for state area10-24
command complex 97-S4A $310,00010-25
2. Advance planning for relocation of10-26
southern Nevada museum 97-S4I $138,03810-27
3. Purchase and renovate old FIB building 97-C2 $7,50010-28
4. Lied Library, UNLV 97-C15 $2,000,00010-29
5. Advance planning for 1999 CIP10-30
program 97-S4D $85,78810-31
6. Advance planning for southern Nevada10-32
records center 97-S4J $4,00010-33
7. Statewide underground storage tank10-34
removal 97-S7 $100,00010-35
8. Replace campus exterior lighting,10-36
NMHI 97-M19 $175,00010-37
Sec. 18. The State Public Works Board shall use 10-38 the $4,058,02910-39
transferred from the projects identified in sections 12 to 10-40 17, inclusive, of10-41
this act to support the Board in carrying out the program of 10-42 capital10-43
improvements summarized in this section. This amount is 10-44 allocated to10-45
projects numbered and described in the executive budget 10-46 for the fiscal10-47
years 1999-2000 and 2000-2001 or otherwise described as 10-48 follows:11-1
Description Project No. Amount11-2
1. New supply administration facility,11-3
Office of the Military, Carson City 99-C3 $310,00011-4
2. Expand shops and warehouses at the11-5
Tonopah, Ely and Indian Springs11-6
Conservation Camps, Division of11-7
Forestry 99-C6 $36,30311-8
3. Remodel old FIB building for11-9
Museums, Carson City 99-C10 $145,59811-10
4. Lied Library Furnishings, UNLV 99-C11 $2,000,00011-11
5. Library and student services building,11-12
WNCC 99-C17 $10,04811-13
6. Wright Hall phase I advance planning,11-14
UNLV 99-C23L $75,32111-15
7. Replace HVAC units, NMHI 99-M15 $175,00011-16
8. Install back-flow preventors, NMHI,11-17
Sparks 99-M24 $90,56911-18
9. Replace fire hydrants, SNCC 99-M28 $59,82511-19
10. Repair flooring and walls in culinary,11-20
LCC 99-M33L $350,00011-21
11. Statewide roofing program 99-S1 $140,00011-22
12. Statewide ADA program 99-S2 $45,42911-23
13. Omega fire sprinkler program 99-S3L $373,76611-24
14. Advance planning for 2001 CIP11-25
program 99-S4A $99,48711-26
15. Advance planning through11-27
construction documents for records11-28
center in southern Nevada, MLA 99-S4D $46,68311-29
16. Statewide underground storage tank11-30
removal program 99-S7 $100,00011-31
Sec. 19. Any remaining balance of the allocated 11-32 amounts in section 1811-33
of this act must not be committed for expenditure after 11-34 June 30, 2003, and11-35
reverts to the fund of origin as soon as all payments of 11-36 money committed11-37
have been made.11-38
Sec. 20. Expenditure of the following sums not 11-39 appropriated from the11-40
state general fund or the state highway fund is hereby 11-41 authorized for the11-42
following projects numbered and described in the 11-43 executive budget for the11-44
fiscal years 1999-2000 and 2000-2001 or otherwise 11-45 described as follows:12-1
Description Project No. Amount12-2
1. Men’s Prison No. 7 (Cold Creek State12-3
Prison), Phase II 99-C1 $10,990,00012-4
2. New supply administration facility12-7
3. Las Vegas building addition for12-8
Division of Agriculture, Las Vegas 99-C5 $46,81612-9
4. Capitol Complex conduit system,12-10
Carson City 99-C8 $251,24912-11
5. Enclose pavilion at Veteran’s Cemetery,12-12
Fernley 99-C9 $988,32412-13
6. Remodel old FIB building for12-14
Museums, Carson City 99-C10 $50,00012-15
7. Law school renovation, UNLV 99-C12 $600,00012-16
8. Redfield campus, phase I, UNR 99-C13 $7,440,00012-17
9. Science building on West Charleston12-18
Campus, CCSN 99-C14 $10,000,00012-19
10. Hi-tech center, GBC, Elko 99-C15 $500,00012-20
11. Student development center, TMCC 99-C16 $3,000,00012-21
12. Region 2 office, shop and storage12-22
complex for the Wildlife and State12-23
Parks divisions, Elko 99-C18 $1,000,00012-24
13. Co-op parking with Carson City 99-C20 $165,40012-25
14. Hi-tech learning center, Green Valley,12-26
CCSN 99-C28L $1,000,00012-27
15. Medical school learning resource12-28
center, UNR 99-C29L $6,000,00012-29
16. Southern Nevada science center, DRI 99-C38L $1,000,00012-30
17. Upgrade building data systems/wiring,12-31
Carson City 99-M26 $206,27012-32
18. Replace vehicle gate, SDCC 99-M31 $188,19812-33
19. Statewide roofing program 99-S1 $213,81412-34
20. Advance Planning through12-35
construction documents for a new12-36
petroleum lab addition to the12-37
Division of Agriculture weights and12-38
measures facility, Sparks 99-S4FL $64,28312-39
Sec. 21. 1. The State Controller may advance 12-40 temporarily from the12-41
state general fund, upon the approval of the Chief of the 12-42 Budget Division of12-43
the Department of Administration, to the State Public 12-44 Works Board, until12-45
the date on which the sums not appropriated from the state 12-46 general fund or13-1
the state highway fund for project 99-C1, Men’s 13-2 Prison No. 7 (Cold Creek13-3
State Prison), Phase II, are received, amounts necessary to 13-4 facilitate the13-5
start of the project. The State Controller shall not advance 13-6 more than the13-7
amount authorized for the project pursuant to section 20 of 13-8 this act. The13-9
advanced amounts must be repaid immediately to the state 13-10 general fund13-11
upon the receipt of the sums not appropriated from the 13-12 state general fund or13-13
the state highway fund.13-14
2. The Chief of the Budget Division of the 13-15 Department of13-16
Administration shall notify the State Controller and the 13-17 Fiscal Analysis13-18
Division of the Legislative Counsel Bureau of the 13-19 approval of an advance13-20
from the state general fund to the State Public Works 13-21 Board pursuant to13-22
subsection 1.13-23
Sec. 22. Except as otherwise provided in section 2 13-24 of this act, the State13-25
Public Works Board shall carry out the provisions of this 13-26 act as provided in13-27
chapter 341 of NRS. The Board shall ensure that qualified 13-28 persons are13-29
employed to accomplish the authorized work. Every 13-30 contract pertaining to13-31
the work must be approved by the Attorney General.13-32
Sec. 23. All state and local governmental agencies 13-33 involved in the13-34
design and construction of the projects enumerated in this 13-35 act shall13-36
cooperate with the State Public Works Board to expedite 13-37 the completion of13-38
the project.13-39
Sec. 24. 1. An ad valorem tax of 15 cents on each 13-40 $100 of assessed13-41
valuation of taxable property is hereby levied for the fiscal 13-42 year13-43
commencing July 1, 1999, and ending June 30, 2000, and 13-44 an ad valorem13-45
tax of 15 cents on each $100 of assessed valuation of 13-46 taxable property is13-47
hereby levied for the fiscal year commencing July 1, 2000, 13-48 and ending June13-49
30, 2001. The taxes levied must be collected in the manner 13-50 provided in13-51
chapter 361 of NRS on all taxable property in this state 13-52 including the net13-53
proceeds of minerals and excluding such property as is by 13-54 law exempt from13-55
taxation.13-56
2. The proceeds of the tax levied by subsection 1 13-57 are hereby13-58
appropriated for each fiscal year to the consolidated bond 13-59 interest and13-60
redemption fund to discharge the obligations of the State 13-61 of Nevada as they13-62
are respectively due in that fiscal year. Any balance of the 13-63 money13-64
appropriated by this section remaining at the end of the 13-65 respective fiscal13-66
years does not revert to the state general fund.13-67
Sec. 25. 1. On or before July 1, 1999, and July 1, 13-68 2000, the State13-69
Controller shall estimate the amount of proceeds of the tax 13-70 levied by13-71
section 24 of this act. If the amount is less than the total 13-72 obligation of the13-73
State of Nevada for payment of the interest on and 13-74 principal of bonds which13-75
will become due in the fiscal year, he shall reserve in the 13-76 state general fund13-77
an amount which is sufficient to pay the remainder of the 13-78 total obligation.13-79
The State Controller may revise the estimate and amount 13-80 reserved.14-1
2. If the 14-2 money in the consolidated bond interest and 14-3 redemption fund14-4
is insufficient to pay those obligations as they become due, 14-5 the State14-6
Controller shall cause the money in reserve to be 14-7 transferred from the state14-8
general fund to the consolidated bond interest and 14-9 redemption fund. The14-10
amount reserved is hereby contingently appropriated for 14-11 that purpose. Any14-12
balance of the sums appropriated by this subsection 14-13 remaining at the end of14-14
the respective fiscal years must not be committed for 14-15 expenditure after June14-16
30 of the respective fiscal years and reverts to the state 14-17 general fund as soon14-18
as all payments of money committed have been made.14-19
3. The State Controller shall report to the 14-20 Legislature or, if the14-21
Legislature is not in session, to the Interim Finance 14-22 Committee:14-23
(a) The amount of any estimate made pursuant to 14-24 subsection 1 and the14-25
amount of money reserved in the state general fund based 14-26 upon the14-27
estimate;14-28
(b) The amount of money transferred from the state 14-29 general fund14-30
pursuant to subsection 2; and14-31
(c) The amount of money which reverts to the state 14-32 general fund14-33
pursuant to subsection 2.14-34
Sec. 26. The State Board of Finance, in its capacity 14-35 as the State14-36
General Obligation Bond Commission and to the extent 14-37 that money is14-38
available, shall pay the expenses related to the issuance of 14-39 general14-40
obligation bonds approved by the 70th session of the 14-41 Nevada Legislature14-42
from the proceeds of those bonds.14-43
Sec. 27. Expenditure of the following sums not 14-44 appropriated from the14-45
state general fund or the state highway fund is hereby 14-46 authorized from the14-47
consolidated bond interest and redemption fund in the 14-48 amount of14-49
$69,300,982 for the fiscal year beginning July 1, 1999, and 14-50 ending June 30,14-51
2000, and in the amount of $75,252,778 for the fiscal year 14-52 beginning July14-53
1, 2000, and ending June 30, 2001.14-54
Sec. 28. With the approval of the Interim Finance 14-55 Committee, the14-56
State Public Works Board and the University and 14-57 Community College14-58
System of Nevada may transfer appropriated and 14-59 authorized money from14-60
one project to another within the same agency or within 14-61 the University and14-62
Community College System of Nevada for those projects 14-63 listed in sections14-64
1, 7, 11, 18, 20 and 30 of this act.14-65
Sec. 29. The State Public Works Board shall let a 14-66 single contract for14-67
project number 99-C1, Men’s Prison No. 7 (Cold Creek 14-68 State Prison),14-69
phase II. The contract for construction is exempt from the 14-70 provisions14-71
relating to bids in NRS 341.145 to 341.151, inclusive.14-72
Sec. 30. The money collected pursuant to the 14-73 annual tax on slot14-74
machines imposed pursuant to NRS 463.385 that is 14-75 distributed to the14-76
special capital construction fund for higher education, 14-77 except any amount14-78
of that money that is needed to pay the principal and 14-79 interest on bonds, is15-1
appropriated to the State Public Works Board for 15-2 the following capital15-3
improvement projects for the University and Community 15-4 College System of15-5
Nevada:15-6
Description Project No. Amount15-7
1. Campus improvements, UNLV 99-U2L $1,628,42415-8
2. Campus improvements, UNR 99-U3L $2,678,17715-9
3. Campus improvements, CCSN 99-U4L $287,03515-10
4. Campus improvements, DRI 99-U5L $79,18815-11
5. Campus improvements, GBC 97-U6L $272,58815-12
6. Campus improvements, WNCC 99-U8L $54,58815-13
Sec. 31. Any remaining balance of the 15-14 appropriation made by section15-15
30 of this act must not be committed for expenditure after 15-16 June 30, 2003,15-17
and reverts to the fund of origin as soon as all payments of 15-18 money15-19
committed have been made.15-20
Sec. 32. Section 26 of chapter 619, Statutes of 15-21 Nevada 1995, as15-22
amended by section 30 of chapter 478, Statutes of Nevada 15-23 1997, at page15-24
1837, is hereby amended to read as follows:15-25
Sec. 26. 1. Except as otherwise provided in15-26
this section, any remaining balance of the appropriations made by15-27
sections 1 and 19 of chapter 619, Statutes of Nevada 1995, must not15-28
be committed for expenditure after June 30, 1999, and reverts to the15-29
state general fund as soon as all payments of money committed15-30
have been made.15-31
2.15-32
remaining balance of the appropriations made by section 1 of15-33
chapter 619, Statutes of Nevada 1995, for projects enumerated in15-34
section 16 of15-35
page 1833, must not be committed for expenditure after June 30,15-36
2001, and reverts to the state general fund as soon as all payments15-37
of money committed have been made.15-38
3. Any remaining balance of the appropriations made by15-39
section 1 of chapter 619, Statutes of Nevada 1995, at page 2331,15-40
for projects enumerated in section 16 of this act, must not be15-41
committed for expenditure after June 30, 2003, and reverts to the15-42
state general fund as soon as all payments of money committed15-43
have been made.15-44
4. Any remaining balance of the appropriations made by15-45
section 1 of chapter 619, Statutes of Nevada 1995, at page 2331,15-46
for the following projects, must not be committed for expenditure15-47
after June 30, 2000, and reverts to the state general fund as soon15-48
as all payments of money committed have been made:16-1
Description Project No.16-2
(a) Improve fire safety in 11 buildings—16-3
SNAMHS/SNCAS, Las Vegas 95-M816-4
(b) Roofing inventory, statewide 95-S4I16-5
(c) Paving, statewide 95-S516-6
(d) Culinary renovation and addition,16-7
NSP, Carson City 95-G516-8
(e) Security/electronics upgrade, NNCC,16-9
Carson City 95-M616-10
(f) Install generators and add lightning16-11
protection, HCC, JCC, WCC, ESP and16-12
TCC 95-M1216-13
(g) Repair utilities, SDCC, Indian Springs 95-M1416-14
(h) Replace windows, units 1 through 4,16-15
NNCC, Carson City 95-M2516-16
(i) Garbage truck wash area, NNCC,16-17
Carson City 95-M3516-18
(j) Connect city sewer to Jones Street NDI16-19
Facility, Las Vegas 95-M3716-20
(k) Exterior painting of 9 armories 95-M2816-21
(l) Kitchen renovations at 9 armories 95-M4316-22
5. Any remaining balance of the appropriation made by16-23
section 1 of chapter 619, Statutes of Nevada 1995, at page 2331,16-24
for project 95-M27, repair utilities in main building basement,16-25
NSP, Carson City, must not be committed for expenditure after16-26
June 30, 2001, and reverts to the state general fund as soon as all16-27
payments of money committed have been made.16-28
Sec. 33. Section 27 of chapter 619, Statutes of 16-29 Nevada 1995, as16-30
amended by section 30 of chapter 478, Statutes of Nevada 16-31 1997, at page16-32
1837, is hereby amended to read as follows:16-33
Sec. 27. 1. Except as otherwise provided in16-34
this section, any remaining balance of the allocated amounts16-35
authorized in section 11 of chapter 619, Statutes of Nevada 1995,16-36
must not be committed for expenditure after June 30, 1999, and16-37
reverts to the bond interest and redemption account in the16-38
consolidated bond interest and redemption fund as soon as all16-39
payments of money committed have been made.16-40
2. Any remaining balance of the allocated amounts authorized16-41
in section 11 of chapter 619, Statutes of Nevada 1995, for projects16-42
enumerated in section 16 of16-43
Nevada 1997, at page 1833, must not be committed for expenditure16-44
after June 30, 2001, and reverts to the bond interest and redemption17-1
account in the consolidated bond interest and redemption fund as17-2
soon as all payments of money committed have been made.17-3
3. Any remaining balance of the appropriations made by17-4
section 11 of chapter 619, Statutes of Nevada 1995, at page 2337,17-5
for the following projects, must not be committed for expenditure17-6
after June 30, 2000, and reverts to the bond interest and17-7
redemption account in the consolidated bond interest and17-8
redemption fund as soon as all payments of money committed17-9
have been made:17-10
Description Project No.17-11
(a) Addition to Lakes Crossing, division17-12
of MH/MR, Sparks 95-C317-13
(b) Education building, UNR, UCCSN,17-14
Reno 95-C717-15
(c) Northern Science Center, DRI,17-16
UCCSN, Reno 95-C1017-17
Sec. 34. Section 3 of chapter 478, Statutes of 17-18 Nevada 1997, at page17-19
1831, is hereby amended to read as follows:17-20
Sec. 3.17-21
1. Except as otherwise provided in subsection 2, any17-22
remaining balance of the appropriations made by section 1 of17-23
17-24
be committed for expenditure after June 30, 2001, and reverts to the17-25
state general fund as soon as all payments of money committed17-26
have been made.17-27
2. Any remaining balance of the appropriations made by17-28
section 1 of chapter 478, Statutes of Nevada 1997, at page 1827,17-29
for projects enumerated in section 17 of this act, must not be17-30
committed for expenditure after June 30, 2003, and reverts to the17-31
state general fund as soon as all payments of money committed17-32
have been made.17-33
Sec. 35. Section 11 of chapter 478, Statutes of 17-34 Nevada 1997, at page17-35
1832, is hereby amended to read as follows:17-36
Sec. 11.17-37
1. Except as otherwise provided in subsection 2, any17-38
remaining balance of the allocated amounts authorized in section 1017-39
of17-40
must not be committed for expenditure after June 30, 2001, and17-41
reverts to the bond interest and redemption account in the17-42
consolidated bond interest and redemption fund as soon as all17-43
payments of money committed have been made.18-1
2. Any remaining balance of the allocated amounts18-2
authorized in section 10 of chapter 478, Statutes of Nevada 1997,18-3
at page 1832, for projects enumerated in section 17 of this act,18-4
must not be committed for expenditure after June 30, 2003, and18-5
reverts to the bond interest and redemption account in the18-6
consolidated bond interest and redemption fund as soon as all18-7
payments of money committed have been made.18-8
Sec. 36. Section 18 of chapter 478, Statutes of 18-9 Nevada 1997, at page18-10
1835, is hereby amended to read as follows:18-11
Sec. 18.18-12
1. Except as otherwise provided in subsection 2, any18-13
remaining balance of the allocated amounts in section 17 of18-14
18-15
be committed for expenditure after June 30, 2001, and reverts to the18-16
fund of origin as soon as all payments of money committed have18-17
been made.18-18
2. Any remaining balance of the allocated amounts in section18-19
17 of chapter 478, Statutes of Nevada 1997, at page 1834, for18-20
projects enumerated in section 17 of this act, must not be18-21
committed for expenditure after June 30, 2003, and reverts to the18-22
fund of origin as soon as all payments of money committed have18-23
been made.18-24
Sec. 37. This act becomes effective upon passage 18-25 and approval.~