Senate Bill No. 475–Committee on Government Affairs
March 18, 1999
____________
Referred to Committee on Government Affairs
SUMMARY—Authorizes public body and department of transportation to use design-build method of contracting in certain circumstances. (BDR 28-517)
FISCAL NOTE: Effect on Local Government: No.
Effect on the State or on Industrial Insurance: No.
~
EXPLANATION – Matter in
bolded italics is new; matter between brackets
AN ACT relating to public works; authorizing a public body to contract with a design-build team or specialty contractor for the design and construction of a public work in certain circumstances; authorizing a public body to contract with a nonprofit organization for the design and construction of a project to restore, enhance or develop wetlands; authorizing the department of transportation to contract with a design-build team with respect to a project for the design and construction, reconstruction or improvement of highways in certain circumstances; setting forth the method in which proposals for a design-build contract must be solicited; setting forth the method in which a design-build team must be selected; authorizing a public body or the department of transportation to employ an architect or engineer to oversee the construction of a public work or project; creating an interim advisory committee to study the use of design-build contracting; and providing other matters properly relating thereto.
THE PEOPLE OF THE STATE OF NEVADA, REPRESENTED IN SENATE AND ASSEMBLY, DO ENACT AS FOLLOWS:
1-1
Section 1. Chapter 338 of NRS is hereby amended by adding thereto1-2
the provisions set forth as sections 2 to 9, inclusive, of this act.1-3
Sec. 2. 1. Except as otherwise provided in this section, a public1-4
body shall contract with a prime contractor for the construction of a1-5
public work for which the estimated cost exceeds $100,000.1-6
2. A public body may contract with a design-build team for the1-7
design and construction of a public work that is a discrete project if the1-8
public body determines that:1-9
(a) The public work is:2-1
(1) A plant or facility for the treatment and pumping of water or the2-2
treatment and disposal of wastewater or sewage, the estimated cost of2-3
which exceeds $100,000,000; or2-4
(2) Any other type of public work, except a stand-alone2-5
underground utility project, the estimated cost of which exceeds2-6
$30,000,000; and2-7
(b) Contracting with a design-build team will enable the public body2-8
to:2-9
(1) Design and construct the public work at a cost that is2-10
significantly lower than the cost that the public body would incur to2-11
design and construct the public work using a different method;2-12
(2) Design and construct the public work in a shorter time than2-13
would be required to design and construct the public work using a2-14
different method, if exigent circumstances require that the public work2-15
be designed and constructed within a short time; or2-16
(3) Ensure that the design and construction of the public work is2-17
properly coordinated, if the public work is unique, highly technical and2-18
complex in nature.2-19
3. In a county whose population is 400,000 or more, a public body2-20
that is responsible for financing public works may, for its own public2-21
works and those financed by a different public body, including, without2-22
limitation, an airport if the airport is owned and operated as a2-23
department of the public body, contract with a design-build team once in2-24
each fiscal year for the design and construction of a public work if the2-25
public body determines that:2-26
(a) The estimated cost of the public work is at least $5,000,000 but less2-27
than $30,000,000; and2-28
(b) Contracting with a design-build team will enable the public body2-29
to:2-30
(1) Design and construct the public work at a cost that is2-31
significantly lower than the cost that the public body would incur to2-32
design and construct the public work using a different method;2-33
(2) Design and construct the public work in a shorter time than2-34
would be required to design and construct the public work using a2-35
different method, if exigent circumstances require that the public work2-36
be designed and constructed within a short time; or2-37
(3) Ensure that the design and construction of the public work is2-38
properly coordinated, if the public work is unique, highly technical and2-39
complex in nature.2-40
4. Notwithstanding the provisions of subsections 1, 2 and 3, a public2-41
body may contract with:2-42
(a) A nonprofit organization for the design and construction of a2-43
project to restore, enhance or develop wetlands.3-1
(b) A prime contractor, specialty contractor or design-build team with3-2
respect to a public work if the public body determines that the public3-3
work is:3-4
(1) Not part of a larger public work; and3-5
(2) Limited in scope to:3-6
(I) Removal of asbestos;3-7
(II) Replacement of equipment or systems for heating, ventilation3-8
and air-conditioning;3-9
(III) Replacement of a roof;3-10
(IV) Landscaping; or3-11
(V) Restoration, enhancement or development of wetlands.3-12
Sec. 3. 1. A public body shall not contract with a design-build team3-13
with respect to a public work unless the governing body of the public3-14
body makes the determinations, at a public hearing, that are required3-15
pursuant to subsection 2, 3 or 4 of section 2 of this act, as applicable.3-16
2. A public body that is required to hold a public hearing pursuant to3-17
this section shall publish notice of the hearing at least once each week3-18
for 3 consecutive weeks in:3-19
(a) A newspaper of general circulation published in the county in3-20
which the public work is proposed to be constructed or, if there is no such3-21
newspaper, in a newspaper of general circulation in the county published3-22
in this state; and3-23
(b) A newspaper of general circulation in this state.3-24
Sec. 4. 1. A public body that is required to contract with a prime3-25
contractor pursuant to subsection 1 of section 2 of this act or elects to3-26
contract with a specialty contractor pursuant to subsection 4 of section 23-27
of this act shall select the prime contractor or specialty contractor, as3-28
appropriate, in accordance with the procedures for bidding that are set3-29
forth in NRS 338.140 to 338.147, inclusive.3-30
2. A public body that contracts with a design-build team pursuant to3-31
sections 2 and 3 of this act shall select the design-build team in3-32
accordance with sections 5 to 8, inclusive, of this act.3-33
Sec. 5. 1. A public body shall advertise for preliminary proposals3-34
for the design and construction of a public work by a design-build team3-35
at least twice each week for 3 consecutive weeks in:3-36
(a) A newspaper of general circulation published in the county in3-37
which the public work is proposed to be constructed or, if there is no such3-38
newspaper, in a newspaper of general circulation in the county published3-39
in this state; and3-40
(b) A newspaper of general circulation in this state.3-41
2. A request for preliminary proposals published pursuant to3-42
subsection 1 must include, without limitation:3-43
(a) A description of the public work to be designed and constructed;4-1
(b) Separate estimates of the costs of designing and constructing the4-2
public work;4-3
(c) The dates on which it is anticipated that the separate phases of the4-4
design and construction of the public work will begin and end;4-5
(d) A statement setting forth the place and time in which a design-4-6
build team desiring to submit a proposal for the public work may obtain4-7
the information necessary to submit a proposal, including, without4-8
limitation, the extent to which designs must be completed for both4-9
preliminary and final proposals and any other requirements for the4-10
design and construction of the public work that the public body4-11
determines to be necessary;4-12
(e) A list of the requirements set forth in section 6 of this act;4-13
(f) A list of the factors that the public body will use to evaluate design-4-14
build teams who submit a proposal for the public work, including,4-15
without limitation:4-16
(1) The relative weight to be assigned to each factor; and4-17
(2) A disclosure of whether the factors that are not related to cost4-18
are, when considered as a group, more or less important in the process of4-19
evaluation than the factor of cost;4-20
(g) Notice that a design-build team desiring to submit a proposal for4-21
the public work must include with its proposal the information used by4-22
the public body to determine finalists among the design-build teams4-23
submitting proposals pursuant to subsection 2 of section 7 of this act and4-24
a description of that information;4-25
(h) A statement that a design-build team whose prime contractor4-26
holds a certificate of eligibility to receive a preference in bidding on4-27
public works issued pursuant to NRS 338.147 should submit a copy of4-28
the certificate of eligibility with its proposal;4-29
(i) A statement as to whether a design-build team that is selected as a4-30
finalist pursuant to section 7 of this act but is not awarded the design-4-31
build contract pursuant to section 8 of this act will be partially4-32
reimbursed for the cost of preparing a final proposal and, if so, an4-33
estimate of the amount of the partial reimbursement; and4-34
(j) The date by which preliminary proposals must be submitted to the4-35
public body, which must not be less than 30 days or more than 60 days4-36
after the date on which the request for preliminary proposals is first4-37
published in a newspaper pursuant to subsection 1.4-38
Sec. 6. To qualify to participate in a project for the design and4-39
construction of a public work, a design-build team must:4-40
1. Obtain a performance bond and payment bond as required4-41
pursuant to NRS 339.025;4-42
2. Obtain insurance covering general liability and liability for errors4-43
and omissions;5-1
3. Not have been found liable for breach of contract with respect to a5-2
previous project, other than a breach for legitimate cause;5-3
4. Not have been disqualified from being awarded a contract5-4
pursuant to NRS 338.017, 338.145 or 408.333; and5-5
5. Ensure that the members of the design-build team possess the5-6
licenses and certificates required to carry out the functions of their5-7
respective professions within this state.5-8
Sec. 7. 1. At least 30 days after the date by which preliminary5-9
proposals must be submitted to the public body, the public body shall5-10
select at least three but not more than five finalists from among the5-11
design-build teams that submitted preliminary proposals. If the public5-12
body does not receive at least three preliminary proposals from design-5-13
build teams that the public body determines to be qualified pursuant to5-14
this section and section 6 of this act, the public body may not contract5-15
with a design-build team for the design and construction of the public5-16
work.5-17
2. The public body shall select finalists pursuant to subsection 1 by:5-18
(a) Verifying that each design-build team which submitted a5-19
preliminary proposal satisfies the requirements of section 6 of this act;5-20
and5-21
(b) Conducting an evaluation of the qualifications of each design-5-22
build team that submitted a preliminary proposal, including, without5-23
limitation, an evaluation of:5-24
(1) The professional qualifications and experience of the members5-25
of the design-build team;5-26
(2) The performance history of the members of the design-build5-27
team concerning other recent, similar projects completed by those5-28
members, if any;5-29
(3) The safety programs established and the safety records5-30
accumulated by the members of the design-build team; and5-31
(4) The proposed plan of the design-build team to manage the5-32
design and construction of the public work that sets forth in detail the5-33
ability of the design-build team to design and construct the public work.5-34
Sec. 8. 1. After selecting the finalists pursuant to section 7 of this5-35
act, the public body shall provide to each finalist a request for final5-36
proposals for the public work. The request for final proposals must:5-37
(a) Set forth the factors that the public body will use to select a design-5-38
build team to design and construct the public work, including the relative5-39
weight to be assigned to each factor; and5-40
(b) Set forth the date by which final proposals must be submitted to5-41
the public body.5-42
2. A final proposal submitted by a design-build team pursuant to this5-43
section must be prepared thoroughly, be responsive to the criteria that the6-1
public body will use to select a design-build team to design and construct6-2
the public work described in subsection 1 and comply with the provisions6-3
of NRS 338.144. If the cost of construction is a factor in the selection of6-4
a design-build team, a design-build team whose prime contractor has6-5
submitted with its proposal a certificate of eligibility to receive a6-6
preference in bidding on public works issued pursuant to NRS 338.1476-7
shall be deemed to have submitted a better proposal than a competing6-8
design-build team whose prime contractor has not submitted such a6-9
certificate of eligibility if the amount proposed by the design-build team6-10
is not more than 5 percent higher than the amount proposed by the6-11
competing design-build team.6-12
3. At least 30 days after receiving the final proposals for the public6-13
work, the public body shall:6-14
(a) Select the most cost-effective and responsive final proposal, using6-15
the criteria set forth pursuant to subsection 1; or6-16
(b) Reject all the final proposals.6-17
4. If a public body selects a final proposal pursuant to paragraph (a)6-18
of subsection 3, the public body shall, at its next regularly scheduled6-19
meeting:6-20
(a) Review and ratify the selection.6-21
(b) Award the design-build contract to the design-build team whose6-22
proposal is selected.6-23
(c) Partially reimburse the unsuccessful finalists if partial6-24
reimbursement was provided for in the request for preliminary proposals6-25
pursuant to paragraph (i) of subsection 2 of section 5 of this act. The6-26
amount of reimbursement must not exceed, for each unsuccessful6-27
finalist, three percent of the total amount to be paid to the design-build6-28
team as set forth in the design-build contract.6-29
(d) Make available to the public a summary setting forth the factors6-30
used by the public body to select the successful design-build team and the6-31
ranking of the design-build teams who submitted final proposals. The6-32
public body shall not release to a third party, or otherwise make public,6-33
financial or proprietary information submitted by a design-build team.6-34
5. A design-build team to whom a contract is awarded pursuant to6-35
this section shall:6-36
(a) Assume overall responsibility for ensuring that the design and6-37
construction of the public work is completed in a satisfactory manner;6-38
and6-39
(b) Use the work force of the prime contractor on the design-build6-40
team to construct at least 15 percent of the public work.6-41
Sec. 9. A public body may employ a registered architect or licensed6-42
professional engineer as a consultant to assist the public body in7-1
overseeing the construction of a public work. An architect or engineer so7-2
employed shall not:7-3
1. Design or construct the public work; or7-4
2. Assume overall responsibility for ensuring that the design or7-5
construction of the public work is completed in a satisfactory manner.7-6
Sec. 10. NRS 338.010 is hereby amended to read as follows: 338.010 As used in this chapter:7-8
1. "Day labor" means all cases where public bodies, their officers,7-9
agents or employees, hire, supervise and pay the wages thereof directly to a7-10
workman or workmen employed by them on public works by the day and7-11
not under a contract in writing.7-12
2. "Design-build contract" means a contract between a public body7-13
and a design-build team in which the design-build team agrees to design7-14
and construct a public work.7-15
3. "Design-build team" means an entity that consists of:7-16
(a) At least one person who is licensed as a general engineering7-17
contractor or a general building contractor pursuant to NRS 624.230 to7-18
624.320, inclusive; and7-19
(b) For a public work that consists of:7-20
(1) A building and its site, at least one person who holds a7-21
certificate of registration to practice architecture pursuant to chapter 6237-22
of NRS.7-23
(2) Anything other than a building and its site, at least one person7-24
who holds a certificate of registration to practice architecture pursuant to7-25
chapter 623 of NRS or is licensed as a professional engineer pursuant to7-26
chapter 625 of NRS.7-27
4. "Design professional" means a person with a professional license7-28
or certificate issued pursuant to chapter 623, 623A or 625 of NRS.7-29
5. "Eligible bidder" means a person who7-30
responsible and responsive contractor or design-build team by a public7-31
body which7-32
7-33
(a) Pay the prevailing wage required pursuant to this chapter;7-34
(b) Pay the contributions for unemployment compensation required7-35
pursuant to chapter 612 of NRS; or7-36
(c) Provide and secure compensation for employees required pursuant to7-37
chapters 616A to 617, inclusive, of NRS.7-38
7-39
(a) Contracts to construct an entire project;7-40
(b) Coordinates all work performed on the entire project;7-41
(c) Uses his own workforce to perform all or a part of the7-42
construction, repair or reconstruction of the project; and8-1
(d) Contracts for the services of any subcontractor or independent8-2
contractor or is responsible for payment to any contracted subcontractors8-3
or independent contractors.8-4
8. "Public body" means the state, county, city, town, school district or8-5
any public agency of this state or its political subdivisions sponsoring or8-6
financing a public work.8-7
8-8
repair or reconstruction of:8-9
(a) A project financed in whole or in part from public money for:8-10
(1) Public buildings;8-11
(2) Jails and prisons;8-12
(3) Public roads;8-13
(4) Public highways;8-14
(5) Public streets and alleys;8-15
(6) Public utilities which are financed in whole or in part by public8-16
money;8-17
(7) Publicly owned water mains and sewers;8-18
(8) Public parks and playgrounds;8-19
(9) Public convention facilities which are financed at least in part with8-20
public funds; and8-21
(10) All other publicly owned works and property whose cost as a8-22
whole exceeds $20,000. Each separate unit which is a part of a project is8-23
included in the cost of the project for the purpose of determining whether a8-24
project meets this threshold.8-25
(b) A building for the University and Community College System of8-26
Nevada of which 25 percent or more of the costs of the building as a whole8-27
are paid from money appropriated by the state or federal money.8-28
8-29
as such are the performance of construction work requiring special skill8-30
and whose principal contracting business involves the use of specialized8-31
building trades or crafts.8-32
11. "Stand-alone underground utility project" means an8-33
underground utility project that is not integrated into a larger project,8-34
including, without limitation:8-35
(a) An underground sewer line or an underground pipeline for the8-36
conveyance of water, including facilities appurtenant thereto; and8-37
(b) A project for the construction or installation of a storm drain,8-38
including facilities appurtenant thereto,8-39
that is not located at the site of a public work for the design and8-40
construction of which a public body is authorized to contract with a8-41
design-build team pursuant to subsection 2 of section 2 of this act.8-42
12. "Wages" means:8-43
(a) The basic hourly rate of pay; and9-1
(b) The amount of pension, health and welfare, vacation and holiday9-2
pay, the cost of apprenticeship training or other similar programs or other9-3
bona fide fringe benefits which are a benefit to the workman.9-4
9-5
semiskilled mechanic, semiskilled workman or unskilled workman. The9-6
term does not include a design professional.9-7
Sec. 11. NRS 338.143 is hereby amended to read as follows: 338.143 1. Except as otherwise provided in subsection 6 and NRS9-9
338.1906 and 338.1907, an agency or political subdivision of the state, or a9-10
public officer, public employee or other person responsible for awarding a9-11
contract for the construction, alteration or repair of a public work, shall not:9-12
(a) Commence such a project, for which the estimated cost exceeds9-13
$100,000, unless it advertises in a newspaper of general circulation in the9-14
state for bids for the project; or9-15
(b) Divide such a project into separate portions to avoid the9-16
requirements of paragraph (a).9-17
2. Except as otherwise provided in subsection 6, a public body that9-18
maintains a list of properly licensed contractors who are interested in9-19
receiving offers to bid on public works projects for which the estimated9-20
cost is more than $25,000 but less than $100,000 shall solicit bids from not9-21
more than three of the contractors on the list for a contract of that value for9-22
the construction, alteration or repair of a public work. The public body9-23
shall select contractors from the list in such a manner as to afford each9-24
contractor an equal opportunity to bid on a public works project. A9-25
properly licensed contractor must submit a written request annually to the9-26
public body to remain on the list. Offers for bids which are made pursuant9-27
to this subsection must be sent by certified mail.9-28
3. Approved plans and specifications for the bids must be on file at a9-29
place and time stated in the advertisement for the inspection of all persons9-30
desiring to bid thereon and for other interested persons. Contracts for the9-31
project must be awarded on the basis of bids received.9-32
4. Any or all bids received in response to an advertisement for bids9-33
may be rejected if the person responsible for awarding the contract9-34
determines that:9-35
(a) The bidder is not responsive or responsible;9-36
(b) The quality of the services, materials, equipment or labor offered9-37
does not conform to the approved plan or specifications; or9-38
(c) The public interest would be served by such a rejection.9-39
5. Before an agency or political subdivision of the state may commence9-40
a project subject to the provisions of this section, based upon a9-41
determination that the public interest would be served by rejecting any bids9-42
received in response to an advertisement for bids, it shall prepare and make9-43
available for public inspection a written statement containing:10-1
(a) A list of all persons, including supervisors, who the agency or10-2
political subdivision intends to assign to the project, together with their10-3
classifications and an estimate of the direct and indirect costs of their labor;10-4
(b) A list of all equipment that the agency or political subdivision10-5
intends to use on the project, together with an estimate of the number of10-6
hours each item of equipment will be used and the hourly cost to use each10-7
item of equipment;10-8
(c) An estimate of the cost of administrative support for the persons10-9
assigned to the project;10-10
(d) An estimate of the total cost of the project; and10-11
(e) An estimate of the amount of money the agency or political10-12
subdivision expects to save by rejecting the bids and performing the project10-13
itself.10-14
6. This section does not apply to:10-15
(a) Any utility subject to the provisions of chapter 318 or 710 of NRS;10-16
(b) Any work of construction, reconstruction, improvement and10-17
maintenance of highways subject to NRS 408.323 or 408.327;10-18
(c) Normal maintenance of the property of a school district;10-19
(d) The Las Vegas Valley water district created pursuant to chapter 167,10-20
Statutes of Nevada 194710-21
(e) The design and construction of a public work for which a public10-22
body contracts with a design-build team pursuant to sections 2 to 9,10-23
inclusive, of this act.10-24
Sec. 12. NRS 338.143 is hereby amended to read as follows: 338.143 1. Except as otherwise provided in subsection 6, an agency10-26
or political subdivision of the state, or a public officer, public employee or10-27
other person responsible for awarding a contract for the construction,10-28
alteration or repair of a public work, shall not:10-29
(a) Commence such a project, for which the estimated cost exceeds10-30
$100,000, unless it advertises in a newspaper of general circulation in the10-31
state for bids for the project; or10-32
(b) Divide such a project into separate portions to avoid the10-33
requirements of paragraph (a).10-34
2. Except as otherwise provided in subsection 6, a public body that10-35
maintains a list of properly licensed contractors who are interested in10-36
receiving offers to bid on public works projects for which the estimated10-37
cost is more than $25,000 but less than $100,000 shall solicit bids from not10-38
more than three of the contractors on the list for a contract of that value for10-39
the construction, alteration or repair of a public work. The public body10-40
shall select contractors from the list in such a manner as to afford each10-41
contractor an equal opportunity to bid on a public works project. A10-42
properly licensed contractor must submit a written request annually to the11-1
public body to remain on the list. Offers for bids which are made pursuant11-2
to this subsection must be sent by certified mail.11-3
3. Approved plans and specifications for the bids must be on file at a11-4
place and time stated in the advertisement for the inspection of all persons11-5
desiring to bid thereon and for other interested persons. Contracts for the11-6
project must be awarded on the basis of bids received.11-7
4. Any or all bids received in response to an advertisement for bids11-8
may be rejected if the person responsible for awarding the contract11-9
determines that:11-10
(a) The bidder is not responsive or responsible;11-11
(b) The quality of the services, materials, equipment or labor offered11-12
does not conform to the approved plan or specifications; or11-13
(c) The public interest would be served by such a rejection.11-14
5. Before an agency or political subdivision of the state may commence11-15
a project subject to the provisions of this section, based upon a11-16
determination that the public interest would be served by rejecting any bids11-17
received in response to an advertisement for bids, it shall prepare and make11-18
available for public inspection a written statement containing:11-19
(a) A list of all persons, including supervisors, who the agency or11-20
political subdivision intends to assign to the project, together with their11-21
classifications and an estimate of the direct and indirect costs of their labor;11-22
(b) A list of all equipment that the agency or political subdivision11-23
intends to use on the project, together with an estimate of the number of11-24
hours each item of equipment will be used and the hourly cost to use each11-25
item of equipment;11-26
(c) An estimate of the cost of administrative support for the persons11-27
assigned to the project;11-28
(d) An estimate of the total cost of the project; and11-29
(e) An estimate of the amount of money the agency or political11-30
subdivision expects to save by rejecting the bids and performing the project11-31
itself.11-32
6. This section does not apply to:11-33
(a) Any utility subject to the provisions of chapter 318 or 710 of NRS;11-34
(b) Any work of construction, reconstruction, improvement and11-35
maintenance of highways subject to NRS 408.323 or 408.327;11-36
(c) Normal maintenance of the property of a school district;11-37
(d) The Las Vegas Valley water district created pursuant to chapter 167,11-38
Statutes of Nevada 194711-39
(e) The design and construction of a public work for which a public11-40
body contracts with a design-build team pursuant to sections 2 to 9,11-41
inclusive, of this act.12-1
Sec. 13. NRS 338.147 is hereby amended to read as follows: 338.147 1.12-3
sections 2 to 9, inclusive, of this act, a public body shall award a contract12-4
for a public work to the contractor who submits the best bid.12-5
2. Except as otherwise provided in subsection12-6
subsection12-7
(a) Has been found to be a responsible and responsive contractor by the12-8
public body; and12-9
(b) At the time he submits his bid, provides to the public body12-10
12-11
preference in bidding on public works issued to him by the state12-12
contractors’ board pursuant to subsection 3,12-13
shall be deemed to have submitted a better bid than a competing12-14
contractor who has not provided a copy of such a valid certificate of12-15
eligibility if the amount of his bid is not more than 5 percent higher than12-16
the amount bid by the competing contractor.12-17
3. The state contractors’ board shall issue a certificate of eligibility to12-18
receive a preference in bidding on public works to a general contractor12-19
who is licensed pursuant to the provisions of chapter 624 of NRS and12-20
submits to the board an affidavit from a certified public accountant12-21
setting forth that the general contractor has:12-22
(a) Paid:12-23
(1) The sales and use taxes imposed pursuant to chapters 372, 37412-24
and 377 of NRS on materials used for construction in this state, including,12-25
without limitation, construction that is undertaken or carried out on land12-26
within the boundaries of this state that is managed by the Federal12-27
Government or is on an Indian reservation or Indian colony, of not less12-28
than $5,000 for each consecutive 12-month period for 60 months12-29
immediately preceding the submission of12-30
certified public accountant;12-31
(2) The motor vehicle privilege tax imposed pursuant to chapter 37112-32
of NRS on the vehicles used in the operation of his business in this state of12-33
not less than $5,000 for each consecutive 12-month period for 60 months12-34
immediately preceding the submission of12-35
certified public accountant; or12-36
(3) Any combination of such sales and use taxes and motor vehicle12-37
privilege tax12-38
12-39
12-40
12-41
12-42
12-43
13-1
13-2
13-3
13-4
(b) Acquired, by inheritance, gift or transfer through a stock option13-5
plan for employees, all the assets and liabilities of a viable, operating13-6
construction firm that possesses a:13-7
(1) License as a general contractor pursuant to the provisions of13-8
chapter 624 of NRS; and13-9
(2) Certificate of eligibility to receive a preference in bidding on13-10
public works.13-11
4. For the purposes of complying with the requirements set forth in13-12
paragraph (a) of subsection 3, a general contractor shall be deemed to13-13
have paid:13-14
(a) Sales and use taxes and motor vehicle privilege taxes paid in this13-15
state by an affiliate or parent company of the contractor, if the affiliate13-16
or parent company is also a general contractor; and13-17
(b) Sales and use taxes paid in this state by a joint venture in which13-18
the contractor is a participant, in proportion to the amount of interest the13-19
contractor has in the joint venture.13-20
5. A contractor who has received a certificate of eligibility to receive13-21
a preference in bidding on public works from the state contractors’ board13-22
pursuant to subsection 3 shall, at the time for the annual renewal of his13-23
contractors’ license pursuant to NRS 624.283, submit to the board an13-24
affidavit from a certified public accountant setting forth that the13-25
contractor has, during the immediately preceding 12 months, paid the13-26
taxes required pursuant to paragraph (a) of subsection 3 to maintain his13-27
eligibility to hold such a certificate.13-28
6. A contractor who fails to submit an affidavit to the board pursuant13-29
to subsection 5 ceases to be eligible to receive a preference in bidding on13-30
public works unless he reapplies for and receives a certificate of13-31
eligibility pursuant to subsection 3.13-32
7. If a contractor who applies to the state contractors’ board for a13-33
certificate of eligibility to receive a preference in bidding on public works13-34
submits false information to the board regarding the required payment of13-35
taxes, the contractor is not eligible to receive a preference in bidding on13-36
public works for a period of 5 years after the date on which the board13-37
becomes aware of the submission of the false information.13-38
8. If any federal statute or regulation precludes the granting of federal13-39
assistance or reduces the amount of that assistance for a particular public13-40
work because of the provisions of subsection 2, those provisions do not13-41
apply insofar as their application would preclude or reduce federal13-42
assistance for that work. The provisions of subsection 2 do not apply to any13-43
contract for a public work which is expected to cost less than $250,000.14-1
14-2
section 8 of this act and subsection 2 of section 27 of this act, if a bid is14-3
submitted by two or more contractors as a joint venture or by one of them14-4
as a joint venturer, the provisions of subsection 2 apply only if both or all14-5
of the joint venturers separately meet the requirements of that subsection.14-6
14-7
14-8
14-9
14-10
14-11
14-12
14-13
14-14
14-15
14-16
14-17
14-18
14-19
14-20
14-21
14-22
14-23
14-24
14-25
14-26
10. The state contractors’ board shall adopt regulations and may14-27
assess reasonable fees relating to the certification of contractors for a14-28
preference in bidding on public works.14-29
11. A person or entity who believes that a contractor wrongfully14-30
holds a certificate of eligibility to receive a preference in bidding on14-31
public works may challenge the validity of the certificate by filing a14-32
written objection with the public body to which the contractor has14-33
submitted a bid or proposal on a contract for the construction of a public14-34
work. A written objection authorized pursuant to this subsection must:14-35
(a) Set forth proof or substantiating evidence to support the belief of14-36
the person or entity that the contractor wrongfully holds a certificate of14-37
eligibility to receive a preference in bidding on public works; and14-38
(b) Be filed with the public body at or after the time at which the14-39
contractor submitted the bid or proposal to the public body and before14-40
the time at which the public body awards the contract for which the bid14-41
or proposal was submitted.14-42
12. If a public body receives a written objection pursuant to14-43
subsection 11, the public body shall determine whether the objection is15-1
accompanied by the proof or substantiating evidence required pursuant15-2
to paragraph (a) of that subsection. If the public body determines that the15-3
objection is not accompanied by the required proof or substantiating15-4
evidence, the public body shall dismiss the objection and may proceed15-5
immediately to award the contract. If the public body determines that the15-6
objection is accompanied by the required proof or substantiating15-7
evidence, the public body shall determine whether the contractor15-8
qualifies for the certificate pursuant to the provisions of this section and15-9
may proceed to award the contract accordingly.15-10
Sec. 13.5. NRS 338.147 is hereby amended to read as follows:15-11
338.147 1.15-12
public body shall award a contract for a public work to the contractor who15-13
submits the best bid.15-14
2. Except as otherwise provided in subsection15-15
subsection15-16
(a) Has been found to be a responsible and responsive contractor by the15-17
public body; and15-18
(b) At the time he submits his bid, provides to the public body15-19
15-20
preference in bidding on public works issued to him by the state15-21
contractors’ board pursuant to subsection 3,15-22
shall be deemed to have submitted a better bid than a competing15-23
contractor who has not provided a copy of such a valid certificate of15-24
eligibility if the amount of his bid is not more than 5 percent higher than15-25
the amount bid by the competing contractor.15-26
3. The state contractors’ board shall issue a certificate of eligibility to15-27
receive a preference in bidding on public works to a general contractor15-28
who is licensed pursuant to the provisions of chapter 624 of NRS and15-29
submits to the board an affidavit from a certified public accountant15-30
setting forth that the general contractor has:15-31
(a) Paid:15-32
(1) The sales and use taxes imposed pursuant to chapters 372, 37415-33
and 377 of NRS on materials used for construction in this state, including,15-34
without limitation, construction that is undertaken or carried out on land15-35
within the boundaries of this state that is managed by the Federal15-36
Government or is on an Indian reservation or Indian colony, of not less15-37
than $5,000 for each consecutive 12-month period for 60 months15-38
immediately preceding the submission of15-39
certified public accountant;15-40
(2) The motor vehicle privilege tax imposed pursuant to chapter 37115-41
of NRS on the vehicles used in the operation of his business in this state of15-42
not less than $5,000 for each consecutive 12-month period for 60 months16-1
immediately preceding the submission of16-2
certified public accountant; or16-3
(3) Any combination of such sales and use taxes and motor vehicle16-4
privilege tax16-5
16-6
16-7
16-8
16-9
16-10
16-11
16-12
16-13
16-14
(b) Acquired, by inheritance, gift or transfer through a stock option16-15
plan for employees, all the assets and liabilities of a viable, operating16-16
construction firm that possesses a:16-17
(1) License as a general contractor pursuant to the provisions of16-18
chapter 624 of NRS; and16-19
(2) Certificate of eligibility to receive a preference in bidding on16-20
public works.16-21
4. For the purposes of complying with the requirements set forth in16-22
paragraph (a) of subsection 3, a general contractor shall be deemed to16-23
have paid:16-24
(a) Sales and use taxes and motor vehicle privilege taxes paid in this16-25
state by an affiliate or parent company of the contractor, if the affiliate16-26
or parent company is also a general contractor; and16-27
(b) Sales and use taxes paid in this state by a joint venture in which16-28
the contractor is a participant, in proportion to the amount of interest the16-29
contractor has in the joint venture.16-30
5. A contractor who has received a certificate of eligibility to receive16-31
a preference in bidding on public works from the state contractors’ board16-32
pursuant to subsection 3 shall, at the time for the annual renewal of his16-33
contractors’ license pursuant to NRS 624.283, submit to the board an16-34
affidavit from a certified public accountant setting forth that the16-35
contractor has, during the immediately preceding 12 months, paid the16-36
taxes required pursuant to paragraph (a) of subsection 3 to maintain his16-37
eligibility to hold such a certificate.16-38
6. A contractor who fails to submit an affidavit to the board pursuant16-39
to subsection 5 ceases to be eligible to receive a preference in bidding on16-40
public works unless he reapplies for and receives a certificate of16-41
eligibility pursuant to subsection 3.16-42
7. If a contractor who applies to the state contractors’ board for a16-43
certificate of eligibility to receive a preference in bidding on public works17-1
submits false information to the board regarding the required payment of17-2
taxes, the contractor is not eligible to receive a preference in bidding on17-3
public works for a period of 5 years after the date on which the board17-4
becomes aware of the submission of the false information.17-5
8. If any federal statute or regulation precludes the granting of federal17-6
assistance or reduces the amount of that assistance for a particular public17-7
work because of the provisions of subsection 2, those provisions do not17-8
apply insofar as their application would preclude or reduce federal17-9
assistance for that work. The provisions of subsection 2 do not apply to any17-10
contract for a public work which is expected to cost less than $250,000.17-11
17-12
9. If a bid is submitted by two or more contractors as a joint venture or17-13
by one of them as a joint venturer, the provisions of subsection 2 apply only17-14
if both or all of the joint venturers separately meet the requirements of that17-15
subsection.17-16
17-17
17-18
17-19
17-20
17-21
17-22
17-23
17-24
17-25
17-26
17-27
17-28
17-29
17-30
17-31
17-32
17-33
17-34
17-35
17-36
10. The state contractors’ board shall adopt regulations and may17-37
assess reasonable fees relating to the certification of contractors for a17-38
preference in bidding on public works.17-39
11. A person or entity who believes that a contractor wrongfully17-40
holds a certificate of eligibility to receive a preference in bidding on17-41
public works may challenge the validity of the certificate by filing a17-42
written objection with the public body to which the contractor has18-1
submitted a bid or proposal on a contract for the construction of a public18-2
work. A written objection authorized pursuant to this subsection must:18-3
(a) Set forth proof or substantiating evidence to support the belief of18-4
the person or entity that the contractor wrongfully holds a certificate of18-5
eligibility to receive a preference in bidding on public works; and18-6
(b) Be filed with the public body at or after the time at which the18-7
contractor submitted the bid or proposal to the public body and before18-8
the time at which the public body awards the contract for which the bid18-9
or proposal was submitted.18-10
12. If a public body receives a written objection pursuant to18-11
subsection 11, the public body shall determine whether the objection is18-12
accompanied by the proof or substantiating evidence required pursuant18-13
to paragraph (a) of that subsection. If the public body determines that the18-14
objection is not accompanied by the required proof or substantiating18-15
evidence, the public body shall dismiss the objection and may proceed18-16
immediately to award the contract. If the public body determines that the18-17
objection is accompanied by the required proof or substantiating18-18
evidence, the public body shall determine whether the contractor18-19
qualifies for the certificate pursuant to the provisions of this section and18-20
may proceed to award the contract accordingly.18-21
Sec. 14. NRS 338.155 is hereby amended to read as follows: 338.15518-23
professional who is not a member of a design-build team for the provision18-24
of services in connection with a public work, the contract:18-25
18-26
18-27
the design professional.18-28
18-29
may dispute a payment or portion thereof that the design professional18-30
alleges is due.18-31
18-32
public body if the public body fails to pay the design professional within18-33
the specific period set forth in the contract pursuant to18-34
18-35
(d) That the prevailing party in an action to enforce the contract is18-36
entitled to reasonable attorney’s fees and costs.18-37
18-38
will receive if the public body pays the design professional within the18-39
specific period set forth in the contract pursuant to18-40
paragraph (a)18-41
18-42
18-43
19-1
Sec. 14.5. NRS 341.161 is hereby amended to read as follows:19-2
341.161 1. The board may, with the approval of the interim finance19-3
committee when the legislature is not in regular or special session, or with19-4
the approval of the legislature by concurrent resolution when the legislature19-5
is in regular or special session, let to a contractor licensed under chapter19-6
624 of NRS a contract for services which assist the architect in the design19-7
of a project of capital improvement. The board shall for that purpose19-8
participate in the development of plans, outlines of specifications and19-9
estimates of costs.19-10
2. The board shall adopt regulations establishing procedures for:19-11
(a) The determination of the qualifications of contractors to bid for19-12
contracts for services described in subsection 1.19-13
(b) The bidding and awarding of such contracts, subject to the19-14
provisions of subsection 3.19-15
(c) The awarding of construction contracts19-16
19-17
guarantees will not be exceeded.19-18
(d) The scheduling and controlling of projects.19-19
3. Bids on contracts for services which assist the architect in the design19-20
of a project of capital improvement must state separately the contractor’s19-21
cost for:19-22
(a) Assisting the architect in the design of the project.19-23
(b) Obtaining all bids for subcontracts.19-24
(c) Administering the construction contract.19-25
4.19-26
19-27
19-28
19-29
19-30
19-31
19-32
19-33
to subsection 1 is a contractor subject to all provisions pertaining to a19-34
contractor in Title 28 of NRS.19-35
Sec. 15. Chapter 408 of NRS is hereby amended by adding thereto the19-36
provisions set forth as sections 16 to 28, inclusive, of this act.19-37
Sec. 16. As used in sections 16 to 28, inclusive, of this act, unless the19-38
context otherwise requires, the words and terms defined in sections 17 to19-39
20, inclusive, of this act have the meanings ascribed to them in those19-40
sections.20-1
Sec. 17. "Design-build contract" means a contract between the20-2
department and a design-build team in which the design-build team20-3
agrees to design and construct a project.20-4
Sec. 18. "Design-build team" means an entity that consists of:20-5
1. At least one person who is licensed as a general engineering20-6
contractor or a general building contractor pursuant to NRS 624.230 to20-7
624.320, inclusive; and20-8
2. At least one person who holds a certificate of registration to20-9
practice architecture pursuant to chapter 623 of NRS or is licensed as a20-10
professional engineer pursuant to chapter 625 of NRS.20-11
Sec. 19. "Prime contractor" means a person who:20-12
1. Contracts to construct an entire project;20-13
2. Coordinates all work performed on the entire project;20-14
3. Uses his own workforce to perform all or a part of the20-15
construction of the project; and20-16
4. Contracts for the services of any subcontractor or independent20-17
contractor or is responsible for payment to any contracted subcontractors20-18
or independent contractors.20-19
Sec. 20. "Project" means a project for the construction,20-20
reconstruction or improvement of a highway.20-21
Sec. 21. 1. The department may contract with a design-build team20-22
for the design and construction of a project if the department determines20-23
that:20-24
(a) Except as otherwise provided in subsection 2, the estimated cost of20-25
the project exceeds $30,000,000; and20-26
(b) Contracting with a design-build team will enable the department20-27
to:20-28
(1) Design and construct the project at a cost that is significantly20-29
lower than the cost that the department would incur to design and20-30
construct the project using a different method;20-31
(2) Design and construct the project in a shorter time than would be20-32
required to complete the project using a different method, if exigent20-33
circumstances require that the project be designed and constructed20-34
within a short time; or20-35
(3) Ensure that the design and construction of the project is20-36
properly coordinated, if the project is unique, highly technical and20-37
complex in nature.20-38
2. Notwithstanding the provisions of subsection 1, the department20-39
may, once in each fiscal year, contract with a design-build team for the20-40
design and construction of a project the estimated cost of which is at least20-41
$5,000,000 but less than $30,000,000 if the department makes the20-42
determinations otherwise required pursuant to paragraph (b) of20-43
subsection 1.21-1
Sec. 22. 1. The department shall not contract with a design-build21-2
team with respect to a project unless the board makes the determinations,21-3
at a public meeting, that are required pursuant to section 21 of this act.21-4
2. If the department is required to hold a public meeting pursuant to21-5
this section, the department shall publish notice of the meeting at least21-6
once each week for 3 consecutive weeks in:21-7
(a) A newspaper of general circulation published in each county in21-8
which the project is proposed to be constructed or, if there is no such21-9
newspaper, in a newspaper of general circulation in each county21-10
published in this state; and21-11
(b) A newspaper of general circulation in this state.21-12
Sec. 23. If the department desires to contract with a design-build21-13
team pursuant to sections 21 and 22 of this act, the department must21-14
select the design-build team in accordance with sections 24 to 27,21-15
inclusive, of this act.21-16
Sec. 24. 1. The department shall advertise for preliminary21-17
proposals for the design and construction of a project by a design-build21-18
team at least twice each week for 3 consecutive weeks in:21-19
(a) A newspaper of general circulation published in each county in21-20
which the project is proposed to be constructed or, if there is no such21-21
newspaper, in a newspaper of general circulation in each county21-22
published in this state; and21-23
(b) A newspaper of general circulation in this state.21-24
2. A request for preliminary proposals published pursuant to21-25
subsection 1 must include, without limitation:21-26
(a) A description of the proposed project;21-27
(b) Separate estimates of the costs of designing and constructing the21-28
project;21-29
(c) The dates on which it is anticipated that the separate phases of the21-30
design and construction of the project will begin and end;21-31
(d) A statement setting forth the place and time in which a design-21-32
build team desiring to submit a proposal for the project may obtain the21-33
information necessary to submit a proposal, including, without21-34
limitation, the extent to which designs must be completed for both21-35
preliminary and final proposals and any other requirements for the21-36
design and construction of the project that the department determines to21-37
be necessary;21-38
(e) A list of the requirements set forth in section 25 of this act;21-39
(f) A list of the factors that the department will use to evaluate design-21-40
build teams who submit a proposal for the project, including, without21-41
limitation:21-42
(1) The relative weight to be assigned to each factor; and22-1
(2) A disclosure of whether the factors that are not related to cost22-2
are, when considered as a group, more or less important in the process of22-3
evaluation than the factor of cost;22-4
(g) Notice that a design-build team desiring to submit a proposal for22-5
the project must include with its proposal the information used by the22-6
department to determine finalists among the design-build teams22-7
submitting proposals pursuant to subsection 2 of section 26 of this act22-8
and a description of that information;22-9
(h) A statement that a design-build team whose prime contractor22-10
holds a certificate of eligibility to receive a preference in bidding on22-11
public works issued pursuant to NRS 338.147 should submit a copy of22-12
the certificate of eligibility with its proposal;22-13
(i) A statement as to whether a bidding design-build team that is22-14
selected as a finalist pursuant to section 26 of this act but is not awarded22-15
the design-build contract pursuant to section 27 of this act will be22-16
partially reimbursed for the cost of preparing a final proposal and, if so,22-17
an estimate of the amount of the partial reimbursement; and22-18
(j) The date by which preliminary proposals must be submitted to the22-19
department, which must not be less than 30 days or more than 60 days22-20
after the date on which the request for preliminary proposals is first22-21
published in a newspaper pursuant to subsection 1.22-22
Sec. 25. To qualify to participate in the design and construction of a22-23
project for the department, a design-build team must:22-24
1. Obtain a performance bond and payment bond as the department22-25
may require;22-26
2. Obtain insurance covering general liability and liability for errors22-27
and omissions;22-28
3. Not have been found liable for breach of contract with respect to a22-29
previous project, other than a breach for legitimate cause;22-30
4. Not have been disqualified from being awarded a contract22-31
pursuant to NRS 338.017, 338.145 or 408.333; and22-32
5. Ensure that the members of the design-build team possess the22-33
licenses and certificates required to carry out the functions of their22-34
respective professions within this state.22-35
Sec. 26. 1. At least 30 days after the date by which preliminary22-36
proposals must be submitted to the department, the department shall22-37
select at least three but not more than five finalists from among the22-38
design-build teams that submitted preliminary proposals. If the22-39
department does not receive at least three preliminary proposals from22-40
design-build teams that the department determines to be qualified22-41
pursuant to this section and section 25 of this act, the department may22-42
not contract with a design-build team for the design and construction of22-43
the project.23-1
2. The department shall select finalists pursuant to subsection 1 by:23-2
(a) Verifying that each design-build team which submitted a23-3
preliminary proposal satisfies the requirements of section 25 of this act;23-4
and23-5
(b) Conducting an evaluation of the qualifications of each design-23-6
build team that submitted a preliminary proposal, including, without23-7
limitation, an evaluation of:23-8
(1) The professional qualifications and experience of the members23-9
of the design-build team;23-10
(2) The performance history of the members of the design-build23-11
team concerning other recent, similar projects completed by those23-12
members, if any;23-13
(3) The safety programs established and the safety records23-14
accumulated by the members of the design-build team; and23-15
(4) The proposed plan of the design-build team to manage the23-16
design and construction of the project that sets forth in detail the ability23-17
of the design-build team to design and construct the project.23-18
Sec. 27. 1. After selecting the finalists pursuant to section 26 of23-19
this act, the department shall provide to each finalist a request for final23-20
proposals for the project. The request for final proposals must:23-21
(a) Set forth the factors that the department will use to select a design-23-22
build team to design and construct the project, including the relative23-23
weight to be assigned to each factor; and23-24
(b) Set forth the date by which final proposals must be submitted to23-25
the department.23-26
2. A final proposal submitted by a design-build team pursuant to this23-27
section must be prepared thoroughly, be responsive to the criteria that the23-28
department will use to select a design-build team to design and construct23-29
the project described in subsection 1 and comply with the provisions of23-30
NRS 338.144. If the cost of construction is a factor in the selection of a23-31
design-build team, a design-build team whose prime contractor has23-32
submitted with its proposal a certificate of eligibility to receive a23-33
preference in bidding on public works issued pursuant to NRS 338.14723-34
shall be deemed to have submitted a better proposal than a competing23-35
design-build team whose prime contractor has not submitted such a23-36
certificate of eligibility if the amount proposed by the design-build team23-37
is not more than 5 percent higher than the amount proposed by the23-38
competing design-build team.23-39
3. At least 30 days after receiving the final proposals for the project,23-40
the department shall:23-41
(a) Select the most cost-effective and responsive final proposal, using23-42
the criteria set forth pursuant to subsection 1; or23-43
(b) Reject all the final proposals.24-1
4. If the department selects a final proposal pursuant to paragraph24-2
(a) of subsection 3, the department shall hold a public meeting to:24-3
(a) Review and ratify the selection.24-4
(b) Award the design-build contract to the design-build team whose24-5
proposal is selected.24-6
(c) Partially reimburse the unsuccessful finalists if partial24-7
reimbursement was provided for in the request for preliminary proposals24-8
pursuant to paragraph (i) of subsection 2 of section 24 of this act. The24-9
amount of reimbursement must not exceed, for each unsuccessful24-10
finalist, three percent of the total amount to be paid to the design-build24-11
team as set forth in the design-build contract.24-12
(d) Make available to the public a summary setting forth the factors24-13
used by the department to select the successful design-build team and the24-14
ranking of the design-build teams who submitted final proposals. The24-15
department shall not release to a third party, or otherwise make public,24-16
financial or proprietary information submitted by a design-build team.24-17
5. A design-build team to whom a contract is awarded pursuant to24-18
this section shall:24-19
(a) Assume overall responsibility for ensuring that the design and24-20
construction of the project is completed in a satisfactory manner; and24-21
(b) Use the work force of the prime contractor on the design-build24-22
team to construct at least 15 percent of the project.24-23
Sec. 28. The department may employ a registered architect or24-24
licensed professional engineer as a consultant to assist the department in24-25
overseeing the construction of a project. An architect or engineer so24-26
employed shall not:24-27
1. Design, construct, reconstruct or improve the highway; or24-28
2. Assume overall responsibility for ensuring that the design or24-29
construction of the project is completed in a satisfactory manner.24-30
Sec. 29. NRS 408.215 is hereby amended to read as follows: 408.215 1. The director has charge of all the records of the24-32
department, keeping records of all proceedings pertaining to the department24-33
and keeping on file information, plans, specifications, estimates, statistics24-34
and records prepared by the department, except those financial statements24-35
described in NRS 408.33324-36
described in paragraph (d) of subsection 4 of section 27 of this act, which24-37
must not become matters of public record.24-38
2. The director may photograph, microphotograph or film or dispose of24-39
the records of the department referred to in subsection 1 as provided in24-40
NRS 239.051, 239.080 and 239.085.24-41
3. The director shall maintain an index or record of deeds or other24-42
references of title or interests in and to all lands or interests in land owned24-43
or acquired by the department.25-1
4. The director shall adopt such regulations as may be necessary to25-2
carry out and enforce the provisions of this chapter.25-3
Sec. 30. NRS 408.317 is hereby amended to read as follows: 408.317 1.25-5
inclusive, of this act, all work of construction, reconstruction,25-6
improvement and maintenance of highways as provided under the25-7
provisions of this chapter is under the supervision and direction of the25-8
director and must be performed in accordance with the plans, specifications25-9
and contracts prepared by him.25-10
2. All maintenance and repair of highways when performed by the25-11
department must be paid out of the state highway fund.25-12
Sec. 31. NRS 408.327 is hereby amended to read as follows: 408.327 Except as otherwise provided in sections 16 to 28, inclusive,25-14
of this act:25-15
1. Whenever the provisions of NRS 408.323 do not apply, the director25-16
shall advertise for bids for such work according to the plans and25-17
specifications prepared by him.25-18
2. The advertisement must state the place where the bidders may obtain25-19
or inspect the plans and specifications and the time and place for opening25-20
the plans and specifications.25-21
3. Publication of the advertisement must be made at least once a week25-22
for 2 consecutive weeks for a total of at least two publications in a25-23
newspaper of general circulation in the county in which the major portion25-24
of the proposed improvement or construction is to be made, and the25-25
advertisement must also be published at least once a week for 2 consecutive25-26
weeks for a total of at least two publications in one or more daily papers of25-27
general circulation throughout the state. The first publication of the25-28
advertisement in the daily newspapers having general circulation25-29
throughout the state must be made not less than 15 days before the time set25-30
for opening bids.25-31
Sec. 32. NRS 408.333 is hereby amended to read as follows: 408.333 Except as otherwise provided in sections 16 to 28, inclusive,25-33
of this act:25-34
1. Before furnishing any person proposing to bid on any advertised25-35
work with the plans and specifications for such work, the director shall25-36
require from the person a statement, verified under oath, in the form of25-37
answers to questions contained in a standard form of questionnaire and25-38
financial statement, which must include a complete statement of the25-39
person’s financial ability and experience in performing public work of a25-40
similar nature.25-41
2. Such statements must be filed with the director in ample time to25-42
permit the department to verify the information contained therein in25-43
advance of furnishing proposal forms, plans and specifications to any26-1
person proposing to bid on the advertised public work, in accordance with26-2
the regulations of the department.26-3
3. Whenever the director is not satisfied with the sufficiency of the26-4
answers contained in the questionnaire and financial statement, he may26-5
refuse to furnish the person with plans and specifications and the official26-6
proposal forms on the advertised project. Any bid of any person to whom26-7
plans and specifications and the official proposal forms have not been26-8
issued in accordance with this section must be disregarded, and the certified26-9
check, cash or undertaking of such a bidder returned forthwith.26-10
4. Any person who is disqualified by the director, in accordance with26-11
the provisions of this section, may request, in writing, a hearing before the26-12
director and present again his check, cash or undertaking and such further26-13
evidence with respect to his financial responsibility, organization, plant and26-14
equipment, or experience, as might tend to justify, in his opinion, issuance26-15
to him of the plans and specifications for the work.26-16
5. Such a person may appeal the decision of the director to the board26-17
no later than 5 days before the opening of the bids on the project. If the26-18
appeal is sustained by the board, the person must be granted the rights and26-19
privileges of all other bidders.26-20
Sec. 33. NRS 408.337 is hereby amended to read as follows: 408.337 Except as otherwise provided in sections 16 to 28, inclusive,26-22
of this act:26-23
1. All bids must be accompanied by an undertaking executed by a26-24
corporate surety authorized to do business in the state, or by cash or a26-25
certified check in an amount equal to at least 5 percent of the amount bid.26-26
2. If the successful bidder fails to execute the contract in accordance26-27
with his bid and give any bond required by law and the contract and bond26-28
are not postmarked or delivered to the department within 20 days after26-29
award of the contract, the undertaking, cash or certified check is forfeited26-30
and the proceeds must be paid into the state highway fund.26-31
3. The failure of the successful bidder to furnish any bond required of26-32
him by law within the time fixed for his execution of the contract26-33
constitutes a failure to execute the contract.26-34
4. If the director deems it is for the best interests of the state, he may,26-35
on refusal or failure of the successful bidder to execute the contract, award26-36
it to the second lowest responsible bidder. If the second lowest responsible26-37
bidder fails or refuses to execute the contract, the director may likewise26-38
award it to the third lowest responsible bidder. On the failure or refusal to26-39
execute the contract of the second or third lowest bidder to whom a26-40
contract is so awarded, their bidder’s security is likewise forfeited to the26-41
state.26-42
5. The bidder’s security of the second and third lowest responsible26-43
bidders may be withheld by the department until the contract has been27-1
finally executed and the bond given as required under the provisions of the27-2
contract, at which time the security must be returned. The bidder’s security27-3
submitted by all other unsuccessful bidders must be returned to them within27-4
10 days after the contract is awarded.27-5
Sec. 34. NRS 408.343 is hereby amended to read as follows: 408.343 Except as otherwise provided in sections 16 to 28, inclusive,27-7
of this act:27-8
1. All bids must be submitted under sealed cover and received at the27-9
address in Nevada stated in the advertisement for bids and must be opened27-10
publicly and read at the time stated in the advertisement.27-11
2. No bids may be received after the time stated in the advertisement27-12
even though bids are not opened exactly at the time stated in the27-13
advertisement. No bid may be opened before that time.27-14
3. Any bid may be withdrawn at any time before the time stated in the27-15
advertisement only by written request or telegram filed with the director27-16
and executed by the bidder or his duly authorized representative. The27-17
withdrawal of a bid does not prejudice the right of the bidder to file a new27-18
bid before the time stated in the advertisement.27-19
4. The department may reject any bid or all bids if, in the opinion of27-20
the department, the bids are unbalanced, incomplete, contain irregularities27-21
of any kind or for any good cause.27-22
5. Until the final award of the contract, the department may reject or27-23
accept any bids and may waive technical errors contained in the bids, as27-24
may be deemed best for the interests of the state.27-25
6. In awarding a contract, the department shall make the award to the27-26
lowest responsible bidder who has qualified and submitted his bid in27-27
accordance with the provisions of this chapter.27-28
Sec. 35. NRS 625.530 is hereby amended to read as follows: 625.530 Except as otherwise provided in sections 2 to 9, inclusive,27-30
and 16 to 28, inclusive, of this act:27-31
1. The State of Nevada or any of its political subdivisions, including a27-32
county, city or town, shall not engage in any public work requiring the27-33
practice of professional engineering or land surveying, unless the maps,27-34
plans, specifications, reports and estimates have been prepared by, and the27-35
work executed under the supervision of, a professional engineer,27-36
professional land surveyor or registered architect.27-37
2. The provisions of this section do not:27-38
(a) Apply to any public work wherein the expenditure for the complete27-39
project of which the work is a part does not exceed $35,000.27-40
(b) Include any maintenance work undertaken by the State of Nevada or27-41
its political subdivisions.28-1
(c) Authorize a professional engineer, registered architect or28-2
professional land surveyor to practice in violation of any of the provisions28-3
of chapter 623 of NRS or this chapter.28-4
(d) Require the services of an architect registered pursuant to the28-5
provisions of chapter 623 of NRS for the erection of buildings or structures28-6
manufactured in an industrial plant, if those buildings or structures meet the28-7
requirements of local building codes of the jurisdiction in which they are28-8
being erected.28-9
3. The selection of a professional engineer, professional land surveyor28-10
or registered architect to perform services pursuant to subsection 1 must be28-11
made on the basis of the competence and qualifications of the engineer,28-12
land surveyor or architect for the type of services to be performed and not28-13
on the basis of competitive fees. If, after selection of the engineer, land28-14
surveyor or architect, an agreement upon a fair and reasonable fee cannot28-15
be reached with him, the public agency may terminate negotiations and28-16
select another engineer, land surveyor or architect.28-17
Sec. 36. NRS 341.171 is hereby repealed.28-18
Sec. 37. 1. The interim advisory committee to study the use of28-19
design-build contracting within this state is hereby created. The interim28-20
advisory committee consists of 13 members who are appointed as follows:28-21
(a) One member appointed by the Northern Nevada Chapter of the28-22
Associated General Contractors.28-23
(b) One member appointed by the Southern Nevada Chapter of the28-24
Associated General Contractors.28-25
(c) One member appointed by the Northern Nevada Chapter of the28-26
Associated Builders and Contractors.28-27
(d) One member appointed by the Southern Nevada Chapter of the28-28
Associated Builders and Contractors.28-29
(e) One member appointed by the Nevada chapter of the American28-30
Institute of Architecture.28-31
(f) One member appointed by the American Consulting Engineers28-32
Council of Nevada.28-33
(g) One member appointed by the Department of Transportation of the28-34
State of Nevada.28-35
(h) One member appointed by the Southern Nevada Water Authority.28-36
(i) One member appointed by the Board of County Commissioners of28-37
Clark County.28-38
(j) One member appointed by the governing body of the City of Las28-39
Vegas.28-40
(k) One member appointed by the governing body of the City of28-41
Henderson.29-1
(l) One member appointed by the governing body of the City of North29-2
Las Vegas.29-3
(m) One member appointed by the Nevada Contractors Association.29-4
2. Members of the interim advisory committee shall serve without29-5
compensation, travel expenses or subsistence allowances, except as they29-6
may be provided by the members’ respective agencies and organizations.29-7
3. The interim advisory committee created pursuant to subsection 129-8
shall:29-9
(a) Examine the methods of design-build contracting that are authorized29-10
to be used pursuant to the provisions of this act; and29-11
(b) Submit a report regarding its findings to the 72nd session of the29-12
Nevada Legislature, accompanied by any suggestions for legislation that29-13
the interim advisory committee determines to be advisable.29-14
Sec. 38. 1. This section becomes effective on October 1, 1999.29-15
2. Sections 1 to 10, inclusive, 13 and 14 to 37, inclusive, of this act29-16
become effective on October 1, 1999, and expire by limitation on October29-17
1, 2003.29-18
3. Section 11 of this act becomes effective on October 1, 1999, and29-19
expires by limitation on May 1, 2013.29-20
4. Section 13.5 of this act becomes effective at 12:01 a.m. on October29-21
1, 2003.29-22
5. Section 12 of this act becomes effective at 12:01 a.m. on May 1,29-23
2013.
29-24
TEXT OF REPEALED SECTION341.171 Single contract for design and construction of capital
29-26
improvement: Legislative approval; regulations.29-27
1. The board may, with the approval of the interim finance committee29-28
when the legislature is not in regular or special session, or with the29-29
approval of the legislature by concurrent resolution when the legislature is29-30
in regular or special session, let to a contractor licensed under chapter 62429-31
of NRS a single contract for both the design and construction of a project29-32
of capital improvement. The board shall for the purpose prepare a29-33
comprehensive sketch plan and narrative of the scope of the work involved29-34
in a project.29-35
2. The board shall adopt regulations establishing procedures for:29-36
(a) The determination of the qualifications of contractors to bid for29-37
contracts for the design and construction of such projects. The board shall29-38
consult with the American Institute of Architects and the Associated30-1
General Contractors, or the successor of either if the named organization30-2
ceases to exist, before adopting procedures under this paragraph.30-3
(b) The board’s approval of designs and architects employed in a30-4
project.30-5
(c) The bidding and awarding of contracts for the design and30-6
construction of projects based on a final cost of the project which the30-7
contractor guarantees will not be exceeded.30-8
(d) The scheduling and controlling of projects.~