AN ACT relating to projects of capital improvement; requiring the repayment for certain projects by certain state agencies; authorizing certain expenditures by the State Public Works Board; levying a property tax to support the consolidated bond interest and redemption fund; making appropriations; and providing other matters properly relating thereto.

 

THE PEOPLE OF THE STATE OF NEVADA, REPRESENTED IN

SENATE AND ASSEMBLY, DO ENACT AS FOLLOWS:

 

    Section 1. The State Board of Finance shall issue general

obligation bonds of the State of Nevada in the face amount of not

more than $150,090,519 for the capital improvements summarized

in this section. This amount is allocated to projects numbered and

described in the executive budget for the Fiscal Years 2003-2004

and 2004-2005 or otherwise described as follows:

 

    Description                  Project No.    Amount

 

    1.  Capital Improvements for the

Department of Corrections:

          Renovate windows and showers at

NNCC................................... 03-M17.. $942,007

          Exercise area security

improvements for HDSP..... 03-M18...... 31,185

          Relocate water lines away from

transformer at SDCC........... 03-M19...... 71,735

          Groundwater protection projects at

HCC & CCC........................ 03-M20. 1,107,981

          Install heat exchanger on cooling

system at HDSP.................... 03-M35.... 280,376

          Repair condensate return system at

SDCC03-M37................. 1,488,344

          Upgrade pedestrian entrance area

at SDCC................................ 03-M38...... 61,662

          Construct weather enclosure for

housing unit 10 gun post at NSP03M-48131,555

          Replace existing cell doors in

housing units at NSP........... 03-M49.... 155,178

          Repair and upgrade exercise areas

units 1-8 at ESP................... 03-M70.... 245,904

          Culinary repairs at LCC03-M71   204,348

 


    2.  Capital Improvements for the

Office of the Military:

          Readiness center for Nevada

National Guard at Henderson. 03-P5.. $440,129

    3.  Capital Improvements for the

University and Community College

System of Nevada:

          TMCC Dandini Campus fire flow

pump station upgrade.............. 03-C2.. $540,692

          Furnishings, equipment, and

buildout of TMCC hi-tech center at the

Redfield Campus..................... 03-C3. 1,646,116

          Furnishings and equipment for the

CCSN Cheyenne Campus

telecommunications building. 03-C4. 4,000,000

          Construction of health sciences

building on West Charleston Campus of

CCSN03-C21................ 19,705,335

          UNLV science engineering and

technology complex construction03-C2335,326,401

          Maxey Science Center, Building

Renovations and Addition, DRI03-C91L1,900,000

          Campus-wide Fire and Life-Safety

Retrofits, UNR................... 03-C94L.... 750,000

          Land Acquisition for Women’s

Athletics Program, UNR.... 03-C95L. 5,000,000

          Renovation of Former Mesquite

High School for CSSN....... 03-C96L.. $750,000

          Security System and Equipment

Upgrades at Various Campuses, CCSN03-C97L   500,000

          Establishment of Oral Health

Clinic, GBC........................ 03-C98L.... 250,000

          Study and Design of Heart

Transplant Facility and Construction of

Embalming Facility and Plasticization Lab,

UNR School of Medicine.. 03-C99L. 1,700,000

          Design electrical and industrial

technology building at GBC03-P5.6.... 132,977

          Math and Science Center

Programming, Schematic Design and

Preliminary Cost Estimate, UNR03-P10L500,000

          Renovation of Getchell Library,

Programming...................... 03-P11L.... 400,000


          Student Services Addition, UNLV,

Design through Construction Documents03-P12L    $500,000

          Campus Improvements-UCCSN

System................................... 03-U1L.... 100,000

          Campus Improvements-UNLV03-U2L3,231,261

          Campus Improvements-UNR03-U3L3,796,839

          Campus Improvements-CCSN03-U4L976,542

          Campus Improvements-DRI03-U5L301,755

          Campus Improvements-GBC03-U6L251,953

          Campus Improvements-TMCC03-U7L696,650

          Campus Improvements-WNCC     03-U8L   645,000

    4.  Capital Improvements for the

Department of Conservation and Natural

Resources:

          Rehabilitate western region

headquarters, Division of Forestry03-C16$604,709

          Replace floor at Jean Conservation

Camp  03-M24....................... 16,694

          Expand shop at Pioche

Conservation Camp............. 03-M52.... 149,282

    5.  Capital Improvements for the

Department of Human Resources:

          150-bed psychiatric hospital at

SNAMHS................................. 03-C1$32,168,576

          New metal building for

recreational use at Caliente Youth Center03-C17  464,065

          Upgrade electric strike door-release

system in 10 buildings at Desert Regional

Center03-M8....................... 196,553

          Install fire sprinklers in the multi-

purpose building at NYTC.. 03-M11...... 72,956

          Renovate swimming pool at the

Caliente Youth Center......... 03-M26.... 303,389

        Renovate heating systems in cottages

at Caliente Youth Center..... 03-M27.... 558,832

          Replace hot water tanks in cottages

at Caliente Youth Center.. 03-M27A.... 306,399

          Replace kitchenettes and

appliances at Caliente Youth Center03-M54220,384

          Renovate central kitchen-

NNAMHS............................. 03-M63. 1,272,422


          Remodel kitchen, replace

equipment, and upgrade floors at Lake’s

Crossing................................ 03-M64.. $671,203

          Feasibility study for a 50-bed

forensic facility-SNAMHS...... 03-P4.... 143,547

    6.  Capital Improvements for the

Department of Administration:

          Phase II of the remodel of building

#17 at the Stewart facility....... 03-C7.. $268,759

          Lease-purchase state office

building for the Department of

Conservation and Natural Resources03-C503,100,000

          Repair exterior tile at the Grant

Sawyer state office building.. 03-M1.... 251,162

          Repair exterior sidewalks at Grant

Sawyer state office building.. 03-M2...... 45,904

          Seismic strengthening of the

capitol annex........................... 03-M4.... 443,236

          HVAC system upgrades for the

capitol building and the capitol building

annex  03-M21..................... 560,506

          HVAC system upgrades at the

State Printing facility........... 03-M22.... 667,902

          Repairs to stucco at Library and

Archives building................. 03-M23.... $47,444

          Upgrade temperature control

system in buildings #6 and 107 at Stewart

facility................................... 03-M51.... 773,319

          Structural evaluation of Kinkead

building, Carson City.............. 03-P1...... 65,323

          Facility use study for Campos

building, Las Vegas................. 03-P2...... 35,000

          Statewide Roofing Program03-S12,323,780

          Statewide ADA Program03-S2.... 637,376

          Statewide Fire Sprinkler Program     03-S3   2,347,192

          Statewide Advance Planning

Program.................................... 03-S4.... 303,750

          Statewide Paving Program03-S51,333,333

          Statewide Asbestos, Lead, Mold,

IAQ Program............................ 03-S6.... 264,085

    7.  Capital Improvements for the

Department of Information Technology:

          Addition to and renovation of state

computer facility................... 03-C10$5,167,283


          Microwave renovations on

mountaintop communications facility     03-C11   $990,134

          Extend state’s communications

backbone to the Stewart Complex03-C13505,324

          Building security enhancements at

all DoIT facilities................. 03-M46...... 70,575

    8.  Capital Improvements for the

Department of Cultural Affairs:

          Design for improved ADA access

at Nevada State Museum in Carson City03-C19   $28,657

          New office for Comstock Historic

District Commission in Virginia City      03-C52   701,273

          Deferred maintenance projects at

Nevada State Museum in Las Vegas03-M12156,480

          Upgrade temperature controls,

valves and ventilation boxes at the Nevada

State Museum and Historical Society

building in Las Vegas.......... 03-M47.... 275,170

          Exterior repairs, flooring

replacements and HVAC Upgrades at

Nevada State Museum in Carson City    03-M67   1,474,560

    9.  Capital Improvements for the

Department of Public Safety:

          New state emergency operations

center-Carson City.................. 03-C6.. $571,175

    10.  Capital Improvements for the

Department of Agriculture:

          Design new office building03-P3$270,881

    11.  Capital Improvements for the

Commission on Economic Development:

          Purchase and renovation of 120

miles of Nevada Northern Railroad Track03-C92L   $500,000

    Sec. 2. Any remaining balance of the allocated amounts

authorized in section 1 of this act must not be committed for

expenditure after June 30, 2007, and reverts to the Bond Interest and

Redemption Account in the Consolidated Bond Interest and

Redemption Fund as soon as all payments of money committed

have been made.


    Sec. 3. 1.  The State Board of Finance may issue the bonds

authorized pursuant to section 1 of this act at the time deemed

appropriate by the Board based on the schedule established for the

completion of the projects described in that section.

    2.  The State Controller may advance temporarily from the

State General Fund, upon the approval of the Chief of the Budget

Division of the Department of Administration, to the State Public

Works Board, until the date on which bonds authorized by section 1

of this act are sold, amounts necessary to facilitate the start of the

projects enumerated in section 1 of this act. The State Controller

shall not advance more than the face amount of the bonds authorized

to be issued. The advanced amounts must be repaid immediately to

the State General Fund upon the sale of the bonds.

    3.  The Chief of the Budget Division of the Department of

Administration shall notify the State Controller and the Fiscal

Analysis Division of the Legislative Counsel Bureau of the approval

of an advance from the State General Fund to the State Public

Works Board pursuant to subsection 2.

    Sec. 4. Commencing on July 1, 2005, the Department of

Information Technology shall repay in annual installments to the

State Treasurer for deposit to the Bond Interest and Redemption

Account in the Consolidated Bond Interest and Redemption Fund

the cost of the following projects authorized pursuant to section 1 of

this act:

    1.  Project 03-C10, addition to and renovation of state computer

facility in Carson City;

    2.  Project 03-C11, microwave renovations on mountaintop

communications facilities;

    3.  Project 03-C13, extend state’s communications backbone to

the Stewart Complex; and

    4.  Project 03-M46, building security enhancements at all DoIT

facilities.

Each installment must be equal to 5 percent of the total cost of the

completed project, including the costs of debt service that are

incurred.

    Sec. 5. Commencing on July 1, 2005, the State Purchasing

Division of the Department of Administration shall repay in annual

installments to the State Treasurer for deposit to the Bond Interest

and Redemption Account in the Consolidated Bond Interest and

Redemption Fund its portion of the cost of the project numbered

and described in the executive budget for Fiscal Years 2003-2004

and 2004-2005 or otherwise described as project 03-S1, statewide

roofing program. Each installment must be equal to 5 percent of the

total cost of the completed project, including the costs of debt

service that are incurred.


    Sec. 6.  There is hereby appropriated from the State Highway

Fund to the State Public Works Board the sum of $16,685,635 to

support the Board in carrying out the program of capital

improvements summarized in this section. This amount is allocated

to projects numbered and described in the executive budget for the

Fiscal Years 2003-2004 and 2004-2005 or otherwise described as

follows:

 

    Description                  Project No.    Amount

 

    1.  Expand shop and

communications facilities at new NHP

headquarters building in Las Vegas03-C8$563,305

    2.  New DMV field services office in

North Las Vegas...................... 03-C9$9,626,364

    3.  Land acquisition for new DMV

office in south Reno............. 03-C15$4,369,285

    4.  West Flamingo DMV intersection

payment  03-C22.................. $33,996

    5.  Install new counters at East

Sahara DMV office.............. 03-M32$1,125,451

    6.  Carson City DMV HVAC03-M91$947,234

    7.  Statewide Roofing Program03-S1$20,000

    Sec. 7.  Any remaining balance of the appropriations made by

section 6 of this act must not be committed for expenditure after

June 30, 2007, and reverts to the State Highway Fund as soon as all

payments of money committed have been made.

    Sec. 8.  The amounts appropriated pursuant to section 6 of this

act from the State Highway Fund must be allocated by the State

Controller as the money is required for the projects and must not be

transferred to the projects from the State Highway Fund until

required to make contract payments.

    Sec. 9.  The State Public Works Board shall transfer the sum of

$314,468 from the amounts allocated or appropriated pursuant to

section 1 of chapter 542, Statutes of Nevada 1999, at pages 2822

to 2836, inclusive, from the projects identified in this section to

projects as authorized in section 11 of this act.

 

    Description                  Project No.    Amount

 

   1.  Remodel Carson City Courthouse

for the Office of the Attorney General       99-C4   $24,000


    2.  Repair 21 housing unit wing

gates, Southern Desert Correctional

Center99-M29.................. $123,000

    3.  Improve shower stalls in housing

units, Nevada State Prison... 99-M30.... $80,000

    4.  Sewer line upgrades, Phase II at

Stewart Complex, Carson City99-M5    $17,411

    5.  Replace fencing and gates,

SNAMHS, Las Vegas........... 99-M10.... $33,467

    6.  Exterior safety lighting and pool

cover, SNCAS, Las Vegas... 99-M18.... $22,207

    7.  Advance planning through

construction documents for addition and

remodel of Special Children’s Clinic,

Reno99-S4B....................... $14,383

    Sec. 10.  The State Public Works Board shall transfer the sum

of $2,501,619 from the amounts allocated pursuant to sections 1 and

4 of chapter 585, Statutes of Nevada 2001, at pages 2991 to 2996,

inclusive, from the projects identified in this section to projects as

authorized in section 11 of this act:

 

    Description                  Project No.    Amount

 

    1.  New State Motor Pool building        01-C4   $2,436,435

    2.  Upgrade exercise areas of units 1-

8 at ESP01-M30................. $13,412

    3.  Replace windows in housing units

1-4 at NNCC........................ 01-M33.... $47,825

    4.  Upgrade pedestrian entrance area

at SDCC01-M38................... $3,947

    Sec. 11.  The State Public Works Board shall use the

$2,816,087 transferred from the projects identified in sections 9 and

10 of this act to support the Board in carrying out the program of

capital improvements summarized in this section. This amount is

allocated to projects numbered and described in the executive

budget for the Fiscal Years 2003-2004 and 2004-2005 or otherwise

described as follows:

 

    Description                  Project No.    Amount

 

    1.  150-bed psychiatric hospital at

SNAMHS................................. 03-C1.... $70,057

    2.  Phase II of the remodel of

building #17 at the Stewart facility 03-C7$2,477,846


    3.  Repair exterior tile at the Grant

Sawyer state office building.. 03-M1.... $65,184

    4.  Renovate windows and showers

at NNCC .............................. 03-M17.. $203,000

    Sec. 12.  Any remaining balance of the allocated amounts in

section 11 of this act must not be committed for expenditure after

June 30, 2007, and reverts to the fund of origin as soon as all

payments of money committed have been made.

    Sec. 13.  The State Public Works Board shall transfer the sum

of $1,177,283 from the amounts appropriated pursuant to section 12

of chapter 585, Statutes of Nevada 2001, at page 2998, for project

01-M1, Renovate HVAC system in east wing of DMV & PS

building, Carson City, to the project numbered and described in the

executive budget for the Fiscal Years 2003-2004 and 2004-2005 or

otherwise described as project 03-M91, Carson City DMV HVAC.

    Sec. 14.  Any remaining balance of the allocated amounts in

section 13 of this act must not be committed for expenditure after

June 30, 2007, and reverts to the fund of origin as soon as all

payments of money committed have been made.

    Sec. 15.  Expenditure of the following sums not appropriated

from the State General Fund or the State Highway Fund is hereby

authorized for the following projects numbered and described in the

executive budget for the Fiscal Years 2003-2004 and 2004-2005 or

otherwise described as follows:

 

    Description                  Project No.    Amount

 

    1.  Rehabilitate state fish hatcheries,

phase II   03-C12.......... $14,500,000

    2.  Petroleum laboratory addition-

Department of Agriculture... 03-C18$1,216,582

    3.  Construction of health sciences

building on West Charleston Campus of

CCSN03-C21................... $500,000

    4.  Science engineering and

technology complex construction, UNLV03-C23  $25,000,000

    5.  Maxey Science Center, Building

Renovations and Addition, DRI03-C91L$200,000

    6.  Readiness center for Nevada

National Guard in Henderson. 03-P5.. $813,000

    7.  Statewide Asbestos, Lead, Mold,

IAQ Program............................ 03-S6.. $500,000

    Sec. 16.  The State Public Works Board shall not execute a

contract for the construction of the following projects until the

Board has determined that the money authorized for those projects


pursuant to section 15 of this act is available for expenditure for

those projects and cannot be expended for other purposes:

 

    Description                                    Project No.

 

    1.  Science engineering and

technology complex construction, UNLV03-C23

    2.  Maxey Science Center, Building

Renovations and Addition, DRI............ 03-C91L

    Sec. 17.  1.  The State Controller may advance temporarily

from the State General Fund, upon the approval of the Chief of the

Budget Division of the Department of Administration, to the State

Public Works Board, until the date on which the sums not

appropriated from the State General Fund or the State Highway

Fund for project 03-P5, readiness center for Nevada National Guard

in Henderson, are received, amounts necessary to facilitate the start

of the project. The advanced amounts must be repaid immediately to

the State General Fund upon the receipt of the sums not

appropriated from the State General Fund or the State Highway

Fund.

    2.  The Chief of the Budget Division of the Department of

Administration shall notify the State Controller and the Fiscal

Analysis Division of the Legislative Counsel Bureau of the approval

of an advance from the State General Fund to the State Public

Works Board pursuant to subsection 1.

    Sec. 18.  The State Public Works Board shall carry out the

provisions of this act as provided in chapter 341 of NRS. The Board

shall ensure that qualified persons are employed to accomplish the

authorized work. Every contract pertaining to the work must be

approved by the Attorney General.

    Sec. 19.  All state and local governmental agencies involved in

the design and construction of the projects enumerated in this act

shall cooperate with the State Public Works Board to expedite the

completion of the project.

    Sec. 20.  1.  An ad valorem tax of 16 cents on each $100 of

assessed valuation of taxable property is hereby levied for the fiscal

year commencing July 1, 2003, and ending June 30, 2004, and an ad

valorem tax of 16 cents on each $100 of assessed valuation of

taxable property is hereby levied for the fiscal year commencing

July 1, 2004, and ending June 30, 2005. The taxes levied must be

collected in the manner provided in chapter 361 of NRS on all

taxable property in this state including the net proceeds of minerals

and excluding such property as is by law exempt from taxation.

Notwithstanding the provisions of NRS 361.453 to the contrary, 1

cent of the levies imposed pursuant to this subsection must not be


included in calculating the limitation set forth in subsection 1 of

NRS 361.453 on the total ad valorem tax levied for all public

purposes.

    2.  An ad valorem tax of 1 cent on each $100 of assessed

valuation of taxable property is hereby levied for the fiscal year

commencing July 1, 2003, and ending June 30, 2004, and an ad

valorem tax of 1 cent on each $100 of assessed valuation of taxable

property is hereby levied for the fiscal year commencing July 1,

2004, and ending June 30, 2005. The taxes levied must be collected

in the manner provided in chapter 361 of NRS on all taxable

property in this state including the net proceeds of minerals and

excluding such property as is by law exempt from taxation. The

proceeds of the taxes levied pursuant to this subsection must be used

exclusively for the repayment of bonded indebtedness issued

pursuant to the provisions of chapter 6, Statutes of Nevada 2001,

Special Session. Notwithstanding the provisions of NRS 361.453 to

the contrary, the levies imposed pursuant to this subsection must not

be included in calculating the limitation set forth in subsection 1 of

NRS 361.453 on the total ad valorem tax levied for all public

purposes.

    3.  The proceeds of the taxes levied by this section are hereby

appropriated for each fiscal year to the Consolidated Bond Interest

and Redemption Fund to discharge the obligations of the State of

Nevada as they are respectively due in that fiscal year. Any balance

of the money appropriated by this section remaining at the end of

the respective fiscal years does not revert to the State General Fund.

    Sec. 21.  1.  On or before July 1, 2003, and July 1, 2004, the

State Controller shall estimate the amount of proceeds of the taxes

levied by section 20 of this act. If the amount is less than the total

obligation of the State of Nevada for payment of the interest on and

principal of bonds which will become due in the fiscal year, he shall

reserve in the State General Fund an amount which is sufficient to

pay the remainder of the total obligation. The State Controller may

revise the estimate and amount reserved.

    2.  If the money in the Consolidated Bond Interest and

Redemption Fund is insufficient to pay those obligations as they

become due, the State Controller shall cause the money in reserve to

be transferred from the State General Fund to the Consolidated

Bond Interest and Redemption Fund. The amount reserved is hereby

contingently appropriated for that purpose. Any balance of the sums

appropriated by this subsection remaining at the end of the

respective fiscal years must not be committed for expenditure after

June 30 of the respective fiscal years and reverts to the State

General Fund as soon as all payments of money committed have

been made.


    3.  The State Controller shall report to the Legislature or, if the

Legislature is not in session, to the Interim Finance Committee:

    (a) The amount of any estimate made pursuant to subsection 1

and the amount of money reserved in the State General Fund based

upon the estimate;

    (b) The amount of money transferred from the State General

Fund pursuant to subsection 2; and

    (c) The amount of money which reverts to the State General

Fund pursuant to subsection 2.

    Sec. 22.  The State Board of Finance, in its capacity as the

State General Obligation Bond Commission and to the extent that

money is available, shall pay the expenses related to the issuance of

general obligation bonds approved by the 72nd Session of the

Nevada Legislature from the proceeds of those bonds.

    Sec. 23.  Expenditure of the following sums not appropriated

from the State General Fund or the State Highway Fund is hereby

authorized from the Consolidated Bond Interest and Redemption

Fund in the amount of $95,917,942 for the fiscal year beginning

July 1, 2003, and ending June 30, 2004, and in the amount of

$98,844,192 for the fiscal year beginning July 1, 2004, and ending

June 30, 2005.

    Sec. 24.  With the approval of the Interim Finance Committee,

the State Public Works Board and the University and Community

College System of Nevada may transfer appropriated and authorized

money from one project to another within the same agency or within

the University and Community College System of Nevada for those

projects listed in sections 1, 6, 11, 15 and 25 of this act.

    Sec. 25.  The money collected pursuant to the annual tax on

slot machines imposed pursuant to NRS 463.385 that is distributed

to the Special Capital Construction Fund for Higher Education,

except any amount of that money which is needed to pay the

principal and interest on bonds, is appropriated to the State Public

Works Board for the following capital improvement projects for the

University and Community College System of Nevada:

 

    Description                  Project No.    Amount

 

    Campus Improvements-UNLV03-U2L$1,821,147

    Campus Improvements-UNR03-U3L$2,438,630

    Campus Improvements-CCSN03-U4L$282,107

    Campus Improvements-DRI03-U5L$109,972

    Campus Improvements-GBC03-U6L$45,187

    Campus Improvements-TMCC03-U7L$302,957

    Sec. 26.  Any remaining balance of the appropriation made by

section 25 of this act must not be committed for expenditure after


June 30, 2007, and reverts to the fund of origin as soon as all

payments of money committed have been made.

    Sec. 27.  Section 3 of chapter 478, Statutes of Nevada 1997, as

last amended by section 38 of chapter 585, Statutes of Nevada 2001,

at pages 3007 and 3008, is hereby amended to read as follows:

    Sec. 3. 1.  Except as otherwise provided in this section,

any remaining balance of the appropriations made by section

1 of chapter 478, Statutes of Nevada 1997, at page 1827, must

not be committed for expenditure after June 30, 2001, and

reverts to the State General Fund as soon as all payments of

money committed have been made.

    2.  Except as otherwise provided in subsection 3, any

remaining balance of the appropriations made by section 1 of

chapter 478, Statutes of Nevada 1997, at page 1827, for

projects enumerated in section 17 of chapter 542, Statutes of

Nevada 1999, at page 2830, must not be committed for

expenditure after June 30, 2003, and reverts to the State

General Fund as soon as all payments of money committed

have been made.

    3.  Any remaining balance of the appropriations made by

section 1 of chapter 478, Statutes of Nevada 1997, at page

1827, for projects enumerated in section 19 of [this act,]

chapter 585, Statutes of Nevada 2001, at page 3000, must

not be committed for expenditure after June 30, 2005, and

reverts to the State General Fund as soon as all payments of

money committed have been made.

    4.  Any remaining balance of the appropriations made by

section 1 of chapter 478, Statutes of Nevada 1997, at page

1827, for the following projects, must not be committed for

expenditure after June 30, 2002, and reverts to the State

General Fund as soon as all payments of money committed

have been made:

 

          Description                              Project No.

 

          (a) Chapel, southern Nevada

veterans’ cemetery.................................... 97-C20

          (b) Phase III expansion, southern

Nevada veterans’ cemetery.................... 97-C20L

          (c) Replace domestic water

supply line, SNMRS................................ 97-M10

          (d) Replace doors and locks,

housing units 1-3, NNCC....................... 97-M27

          (e) Statewide fire sprinkler

program....................................................... 97-S3

 


          (f) Statewide paving.......................... 97-S5

          (g) Campus improvements,

TMCC......................................................... 97-U7

 

    5.  Any remaining balance of the appropriations made by

section 1 of chapter 478, Statutes of Nevada 1997, at page

1827, for project 97-C16, southern Nevada veterans’ home,

must not be committed for expenditure after June 30, [2001,]

2004, and reverts to the State General Fund as soon as all

payments of money committed have been made.

    Sec. 28.  Section 11 of chapter 478, Statutes of Nevada 1997,

as last amended by section 40 of chapter 585, Statutes of Nevada

2001, at page 3008, is hereby amended to read as follows:

    Sec. 11. 1.  Except as otherwise provided in this

section, any remaining balance of the allocated amounts

authorized in section 10 of chapter 478, Statutes of Nevada

1997, at page 1832, must not be committed for expenditure

after June 30, 2001, and reverts to the bond interest and

redemption account in the Consolidated Bond Interest and

Redemption Fund as soon as all payments of money

committed have been made.

    2.  [Any] Except as otherwise provided in subsection 4,

any remaining balance of the allocated amounts authorized in

section 10 of chapter 478, Statutes of Nevada 1997, at page

1832, for projects enumerated in section 17 of chapter 542,

Statutes of Nevada 1999, at page 2830, must not be

committed for expenditure after June 30, 2003, and reverts to

the Bond Interest and Redemption Account in the

Consolidated Bond Interest and Redemption Fund as soon as

all payments of money committed have been made.

    3.  Any remaining balance of the allocated amounts

authorized in section 10 of chapter 478, Statutes of Nevada

1997, at page 1832, for projects enumerated in section 19 of

[this act,] chapter 585, Statutes of Nevada 2001, at page

3000, must not be committed for expenditure after June 30,

2005, and reverts to the Bond Interest and Redemption

Account in the Consolidated Bond Interest and Redemption

Fund as soon as all payments of money committed have been

made.

    4.  Any remaining balance of the allocated amounts

authorized in section 10 of chapter 478, Statutes of Nevada

1997, at page 1832, for project 97-C15, Lied Library,

UNLV, must not be committed for expenditure after

June 30, 2005, and reverts to the Bond Interest and

Redemption Account in the Consolidated Bond Interest and


Redemption Fund as soon as all payments of money

committed have been made.

    Sec. 29.  Section 3 of chapter 542, Statutes of Nevada 1999, as

amended by section 43 of chapter 585, Statutes of Nevada 2001, at

page 3010, is hereby amended as follows:

    Sec. 3. 1.  Except as otherwise provided in [subsection

2.] this section, any remaining balance of the allocated

amounts authorized in sections 1 and 2 of chapter 542,

Statutes of Nevada 1999, at pages 2822 to 2826, inclusive,

must not be committed for expenditure after June 30, 2003,

and reverts to the Bond Interest and Redemption Account in

the Consolidated Bond Interest and Redemption Fund as soon

as all payments of money committed have been made.

    2.  Any remaining balance of the allocated amounts

authorized in section 1 of chapter 542, Statutes of Nevada

1999, at page 2822, for projects enumerated in section 20 of

[this act,] chapter 585, Statutes of Nevada 2001, at page

3002, must not be committed for expenditure after June 30,

2005, and reverts to the Bond Interest and Redemption

Account in the Consolidated Bond Interest and Redemption

Fund as soon as all payments of money committed have been

made.

    3.  Any remaining balance of the allocated amounts

authorized in section 1 of chapter 542, Statutes of Nevada

1999, at page 2822, for the following projects, must not be

committed for expenditure after June 30, 2004, and reverts

to the Bond Interest and Redemption Account in the

Consolidated Bond Interest and Redemption Fund as soon

as all payments of money committed have been made:

 

          Description                                Project No.

 

          (a) New supply administration

facility, Carson City.................................. 99-C3

          (b) SNAMHS, advance

planning for psychiatric emergency

crisis center................................................ 99-C7

          (c) Capitol complex conduit

system, phase II, Carson City.................. 99-C8

          (d) Enclose pavilion at

Veteran’s Cemetery, Fernley.................... 99-C9

          (e) Law School Renovation,

UNLV....................................................... 99-C12

          (f) Science building on West

Charleston campus, CCSN.................... 99-C14


          (g) Library and student center,

WNCC...................................................... 99-C17

 

          (h) High-Tech learning center,

Green Valley, CCSN............................ 99-C28L

          (i) Statewide ADA program............ 99-S2

 

    4.  Any remaining balance of the allocated amounts

authorized in section 1 of chapter 542, Statutes of Nevada

1999, at page 2822, for the following projects, must not be

committed for expenditure after June 30, 2005, and reverts

to the Bond Interest and Redemption Account in the

Consolidated Bond Interest and Redemption Fund as soon

as all payments of money committed have been made:

 

          Description                                Project No.

 

          (a) Lied Library Furnishings,

UNLV....................................................... 99-C11

          (b) Redfield campus, phase I,

UNR99-C13

          (c) Student development center,

TMCC...................................................... 99-C16

          (d) High-Tech learning center,

TMCC.................................................... 99-C37L

          (e) Provide second exit from

dormitories and install fire sprinklers at

Caliente Youth Center............................. 99-M1

          (f) Repair/remodel

multipurpose building and replace

ceiling and wall covers in the

gymnasium, NYTC, Elko...................... 99-M22

          (g) Library Upgrade building

data systems/wiring for Capitol Complex

and Sawyer Building, Carson City and

Las Vegas............................................... 99-M26

          (h) Statewide asbestos, lead and

indoor air quality program...................... 99-S6

 

    5.  Any remaining balance of the allocated amounts

authorized in section 1 of chapter 542, Statutes of Nevada

1999, at page 2822, for projects enumerated in section 9 of

this act, must not be committed for expenditure after

June 30, 2007, and reverts to the Bond Interest and

Redemption Account in the Consolidated Bond Interest and


Redemption Fund as soon as all payments of money

committed have been made.

 

    Sec. 30.  Section 9 of chapter 542, Statutes of Nevada 1999, as

amended by section 45 of chapter 585, Statutes of Nevada 2001, at

page 3010, is hereby amended to read as follows:

    Sec. 9. [Any]

    1.  Except as otherwise provided in subsection 2, any

remaining balance of the appropriations made by section 7 of

chapter 542, Statutes of Nevada 1999, at page 2828, must not

be committed for expenditure after June 30, 2003, and reverts

to the State Highway Fund as soon as all payments of money

committed have been made.

    2.  Any remaining balance of the appropriations made

by section 7 of chapter 542, Statutes of Nevada 1999, at

page 2828, for projects 99-H1, new highway patrol building,

Las Vegas, and 99-H2, covered parking at highway patrol

facility, Las Vegas, must not be committed for expenditure

after June 30, 2005, and reverts to the fund of origin as

soon as all payments of money committed have been made.

    Sec. 31. Section 19 of chapter 542, Statutes of Nevada 1999,

as amended by section 46 of chapter 585, Statutes of Nevada 2001,

at pages 3010 and 3011, is hereby amended to read as follows:

    Sec. 19. 1.  Except as otherwise provided in

[subsection 2,] this section, any remaining balance of the

allocated amounts in section 18 of chapter 542, Statutes of

Nevada 1999, at page 2830, must not be committed for

expenditure after June 30, 2003, and reverts to the fund of

origin as soon as all payments of money committed have been

made.

    2.  Any remaining balance of the allocated amounts

authorized in section 18 of chapter 542, Statutes of Nevada

1999, at page 2830, for projects enumerated in section 20 of

[this act,] chapter 585, Statutes of Nevada 2001, at page

3002, must not be committed for expenditure after June 30,

2005, and reverts to the fund of origin as soon as all payments

of money committed have been made.

    3.  Any remaining balance of the allocated amounts

authorized in section 18 of chapter 542, Statutes of Nevada

1999, at page 2830, for the following projects must not be

committed for expenditure after June 30, 2004, and reverts

to the fund of origin as soon as all payments of money

committed have been made:

 

 

 


          Description                                Project No.

 

          (a) New supply administration

facility, Office of the Military, Carson

City.. 99-C3

          (b) Library and student services

building, WNCC..................................... 99-C17

          (c) Statewide ADA Program........... 99-S2

 

    4.  Any remaining balance of the allocated amounts

authorized in section 18 of chapter 542, Statutes of Nevada

1999, at page 2830, for the following projects must not be

committed for expenditure after June 30, 2005, and reverts

to the fund of origin as soon as all payments of money

committed have been made:

 

          Description                                Project No.

 

          (a) Lied Library Furnishings,

UNLV....................................................... 99-C11

          (b) Omega fire sprinkler

program................................................... 99-S3L

 

    Sec. 32.  Section 3 of chapter 585, Statutes of Nevada 2001, at

page 2995, is hereby amended to read as follows:

    Sec. 3.  [Any]

    1.  Except as otherwise provided in subsection 2, any

remaining balance of the appropriations made by section 2 of

[this act] chapter 585, Statutes of Nevada 2001, at page

2993, must not be committed for expenditure after June 30,

2005, and reverts to the State General Fund as soon as all

payments of money committed have been made.

    2.  Any remaining balance of the appropriations made

by section 2 of chapter 585, Statutes of Nevada 2001, at

page 2993, for the following projects, must not be committed

for expenditure after June 30, 2007, and reverts to the State

General Fund as soon as all payments of money committed

have been made:

 

          Description                                Project No.

 

          (a) Upgrade exercise areas of

units 1-8 at ESP..................................... 01-M30

          (b) Replace windows in housing

units 1-4 at NNCC................................. 01-M33


          (c) Upgrade pedestrian

entrance area at SDCC......................... 01-M38

 

    Sec. 33.  Section 5 of chapter 585, Statutes of Nevada 2001, at

page 2997, is hereby amended to read as follows:

    Sec. 5.  [Any]

    1.  Except as otherwise provided in subsection 2, any

remaining balance of the allocated amounts authorized in

section 4 of [this act] chapter 585, Statutes of Nevada 2001,

at page 2995, must not be committed for expenditure after

June 30, 2005, and reverts to the Bond Interest and

Redemption Account in the Consolidated Bond Interest and

Redemption Fund as soon as all payments of money

committed have been made.

    2.  Any remaining balance of the allocated amounts

authorized in section 4 of chapter 585, Statutes of Nevada

2001, at page 2995, for project 01-C4, New State Motor Pool

building, must not be committed for expenditure after

June 30, 2007, and reverts to the Bond Interest and

Redemption Account in the Consolidated Bond Interest and

Redemption Fund as soon as all payments of money

committed have been made.

    Sec. 34.  Section 13 of chapter 585, Statutes of Nevada 2001,

at page 2998, is hereby amended to read as follows:

    Sec. 13. [Any]

    1.  Except as otherwise provided in subsection 2, any

remaining balance of the appropriations made by section 12

of [this act] chapter 585, statutes of Nevada 2001, at page

2998, must not be committed for expenditure after June 30,

2005, and reverts to the State Highway Fund as soon as all

payments of money committed have been made.

    2.  Any remaining balance of the appropriations made

by section 12 of chapter 585, Statutes of Nevada 2001, at

page 2998, for project 01-M1, Renovate HVAC system in

east wing of DMV & PS building, Carson City, must not be

committed for expenditure after June 30, 2007, and reverts

to the State Highway Fund as soon as all payments of

money committed have been made.

    Sec. 35. Section 15 of chapter 585, Statutes of Nevada 2001,

at page 2998, is hereby amended to read as follows:

    Sec. 15.  1.  Except as otherwise provided in subsection

2, the [following expenditures are] expenditure of

$15,000,000 from money credited to the account of the State

of Nevada in the Unemployment Trust Fund pursuant to 42

U.S.C. § 1103 is hereby authorized to support the State Public

Works Board in carrying out the program of capital


improvements summarized in this section for the project

numbered and described in the executive budget for the Fiscal

Years 2001-2002 and 2002-2003 or otherwise described as

project 01-E1, new office building for Employment Security

Division . [:

    (a) From the Employment Security Fund created pursuant

to NRS 612.615, $1,000,000; and

    (b) From money credited to the account of the State of

Nevada in the Unemployment Trust Fund pursuant to 42

U.S.C. § 1103, $3,000,000.]

    2.  The amount which may be expended during a fiscal

year pursuant to [paragraph (b) of] subsection 1 must not

exceed the amount by which the aggregate of the amounts

credited to the account of this state pursuant to 42 U.S.C. §

1103 during that fiscal year and the 24 preceding fiscal years

exceeds the aggregate of the amounts expended pursuant to

NRS 612.617 and charged against the amounts credited to the

account of this state during any of those 25 fiscal years. If the

provisions of this subsection limit the amount of funding

authorized pursuant to [paragraph (b) of] subsection 1, the

Interim Finance Committee may authorize [additional]

funding from the Employment Security Fund to fund the

project. The expenditures authorized pursuant to this section

must not exceed [$4,000,000] $15,000,000 from all sources

unless an increased amount is approved by the Legislature or,

if the Legislature is not in session, by the Interim Finance

Committee.

    3.  [Any remaining balance of the allocated amount in

paragraph (a) of subsection 1 must not be committed for

expenditure after June 30, 2005, and reverts to the

Employment Security Fund as soon as all payments of money

committed have been made.

    4.] Any remaining balance of the allocated amount in

[paragraph (b) of] subsection 1 must not be committed for

expenditure after June 30, [2003,] 2007, and reverts to the

fund of origin as soon as all payments of money committed

have been made.

    Sec. 36.  Section 24 of chapter 585, Statutes of Nevada 2001,

at page 3003, is hereby amended to read as follows:

    Sec. 24.  The State Public Works Board shall not

execute a contract for the construction of the following

projects until the Board receives the money authorized for

those projects pursuant to section 23 of [this act:] chapter

585, Statutes of Nevada 2001, at page 3003:

 

 


          Description                              Project No.

 

          1.  Furnishings and build-out,

Redfield campus, phase I, UNR.............. 01-C16

          2.  New campus library, UNR........ 01-C24

          3.  Academic and student

services building, NSC............................ 01-C25

        [4.  Telecommunications

building on Cheyenne campus, CCSN01-C29L]

    Sec. 37. Section 16 of chapter 585, Statutes of Nevada 2001,

at page 2999, is hereby repealed.

    Sec. 38.  The inclusion of project 03-C50 in section 1 of this

act constitutes the legislative approval of the project required

pursuant to NRS 353.550.

    Sec. 39. This act becomes effective upon passage and

approval.

 

20~~~~~03