Amend sec. 10, page 6, line 35, by deleting “20” and inserting “15”.
Amend sec. 10, page 6, by deleting lines 39 through 42 and inserting:
“3. The period over which payments are made on a performance contract must equal the period over which the operating cost savings are amortized. Payments on a performance contract must not commence until the operating cost-savings measures have been installed by the qualified service company.”.
Amend sec. 24, page 13, line 41, by deleting “20” and inserting “15”.