ASSEMBLY AGENDA

for the

Assembly Committee on Ways and Means

AND THE

Senate Committee on Finance

JOINT SUBCOMMITTEE ON HIGHER EDUCATION AND CAPITAL IMPROVEMENTS

 

  Day  Friday              Date  April 1, 2005              Time   8:00 a.m.           Room  3137

 


If you cannot attend the meeting, you can listen to it live over the Internet.  The address for the legislative website is http://www.leg.state.nv.us.  For audio broadcasts, click on the link “Listen to Live Meetings.”

Note:  We are pleased to make reasonable accommodations for members of the public who are disabled and wish to attend the meeting.  If special arrangements for the meeting are necessary, please notify the Assembly Committee on Ways and Means at (775) 684-8591.

(R#) Indicates the reprint number of the bill/resolution being considered.

PLEASE PROVIDE 19 COPIES OF YOUR EXHIBITS AND NOTES

REVISED

Volume III

 

Executive Budget Page

State Public Works Board

Appendix 12-14

    Daniel K. O’Brien, Manager

 

Department of Motor Vehicles

 

CO2  North LV DMA FF & E

$      974,403

Division of Forestry

M05  Indian Springs Camp Upgrade

 

$        87,166  a.

M27  Las Vegas Native Plant Nursery Renovation

$      474,995  a.

M28  Kyle Canyon Fire Station Upgrades

$        96,930  a.

P18   Kyle Canyon Fire Station Feasibility Study

$        44,100

Department of Corrections

 

C20b High Desert State Prison Phase IV, 3 Housing Units

$  58,570,649  a.

M06  High Desert State Prison Install Generator No. 4

$       532,738

M13  NV State Prison Install Backflow Preventors

$       188,047

M14  Silver Springs Conservation Camp Expand Sewage Leach Field

$       598,929

M15  Ely State Prison Sewage Treatment Upgrades

$    3,102,880  a.

M16  Pioche Conservation Camp Sewage Disposal Upgrades

$       234,467

M17  Indian Springs Sewage Disposal 

$    2,658,136

M18  Ely State Prison Replace Air Handling Units – Phase 1

$    3,781,902

M19  N NV Corr Center Phone Cable Replacement

$       146,649  a.

M22  Lovelock Corr Center Central Boiler Plant Renovation

$       337,999

M24  Warm Springs Corr Cntr Locks Doors Controls Intercom

$       513,173  a.

M25  S Desert Corr Doors, Locks & Control Panels

$       406,599  a.

M29  Carlin Consv Camp Groundwater Protection

$       599,874  a.

M30  Lovelock Corr Center Building Structural Remediation

$       313,747  a.

M31  S Desert Corr Center Boiler Replacement

$       397,421  a.

M36  Lovelock Corr Center Central Chiller Plant Renovation

$    1,122,864  a.

M37  Ely State Prison High Mast Cable System + Operators

$       454,465  a.

M38  Warm Springs Corr Center Boiler Replacement

$       205,547  a.

M40  Lovelock Corr Center Repair Perimeter Fence

$         56,056  a.

P01   Humboldt & Silver Springs Camps Cut Arsenic Domestic Water

$         65,599

P02   S Desert Corr Center Water Line Replacement

$       488,297

P03   High Desert State Prison Erosion Control

$         61,718

P05   Women’s Re-entry Center – Advance Planning

$    1,246,100

P07   New Prison #8 Advance Planning, Indian Springs

$    1,800,000

P12   Corrections Statewide Utilization Plan

$       363,189

P28   Indian Springs Work Center

$    1,970,385

 a.     Project cost under review for possible revision by State Public Works Board.