BUDGET HEARINGS
VOLUME III |
Executive Budget Page |
STATE PUBLIC WORKS BOARD |
Appendix 12 - 14 |
Daniel K. O’Brien, Manager |
|
Project No. Project Description |
Cost |
Department of Motor Vehicles |
|
C02 North LV DMV: FF & E |
$ 974,403 |
Division of Forestry |
|
M05 Indian Springs Camp Upgrade |
$ 87,166 |
M27 Las Vegas Native Plant Nursery Renovation |
$ 474,995 a. |
M28 Kyle Canyon Fire Station Upgrades |
$ 96,930 a. |
P18 Kyle Canyon Fire Station Feasibility Study |
$ 44,100 |
Department of Corrections |
|
C20b High Desert State Prison Phase IV, 3 Housing Units |
$ 58,570,649 a. |
M06 High Desert State Prison Install Generator No. 4 |
$ 532,738 |
M13 Nevada State Prison Install Backflow Preventors |
$ 188,047 |
M14 Silver Springs Conservation Camp Expand Sewage Leachfield |
$ 598,929 |
M15 Ely State Prison Sewage Treatment Upgrades |
$ 3,102,880 a. |
M16 Pioche Conservation Camp Sewage Disposal Upgrades |
$ 234,467 |
M17 Indian Springs Sewage Disposal |
$ 2,658,136 |
M18 Ely State Prison Replace Air Handling Units – Phase 1 |
$ 3,781,902 |
M19 Northern Nevada Correctional Center Phone Cable Replacement |
$ 146,649 a. |
M22 Lovelock Correctional Center Central Boiler Plant Renovation |
$ 337,999 a. |
M24 Warm Springs Correctional Center Locks, Doors, Control Panel and Intercom |
$ 513,173 a. |
M25 Southern Desert Correctional Center Doors, Locks and Control Panels |
$ 406,599 a. |
M29 Carlin Conservation Camp Groundwater Protection |
$ 599,874 a. |
M30 Lovelock Correctional Center Building Structural Remediation |
$ 313,747 a. |
M31 Southern Desert Correctional Center Boiler Replacement |
$ 397,421 a. |
M36 Lovelock Correctional Center Central Chiller Plant Renovation |
$ 1,122,864 a. |
M37 Ely State Prison Replace High Mast Cable System and Operators |
$ 454,465 a. |
M38 Warm Springs Correctional Center Boiler Replacement |
$ 205,547 a. |
M40 Lovelock Correctional Center Repair Perimeter Fence |
$ 56,056 a. |
P01 Arsenic Reduction in Domestic Water, Humboldt and Silver Springs Camps |
$ 65,599 |
P02 Southern Desert Correctional Center Water Line Replacement |
$ 488,297 |
P03 High Desert State Prison Erosion Control |
$ 61,718 |
P05 Southern Nevada Women’s Re-entry Center – Advance Planning |
$ 1,246,100 |
P07 New Prison No. 8 Advance Planning, Indian Springs |
$ 1,800,000 |
P12 Advance Planning, Corrections Statewide Utilization Plan |
$ 363,189 |
P28 Indian Springs Work Center – Advance Planning |
$ 1,970,385 |
a. Project cost under review for possible revision by State Public Works Board |
|
|
|