SENATE AGENDA

for the

Senate Finance/Assembly Ways and Means

JOINT SUBCOMMITTEE ON HIGHER EDUCATION AND CAPITAL IMPROVEMENTS

 

   Day     Friday                    Date      April 1, 2005                       Time       8:00 a.m.                  Room      3137

 


If you cannot attend the meeting, you can listen to it live over the Internet.  The address for the legislative website is http://www.leg.state.nv.us.  For audio broadcasts, click on the link “Listen to Live Meetings.”

Note:  We are pleased to make reasonable accommodations for members of the public who are disabled and wish to attend the meeting.  If special arrangements for the meeting are necessary, please notify the Senate Committee on Finance at (775) 684-1488.

(R#) Indicates the reprint number of the bill/resolution being considered.

PLEASE PROVIDE 18 COPIES OF YOUR EXHIBITS AND NOTES.

 

FIRST REVISED AGENDA

 

BUDGET HEARINGS

 

                           VOLUME III

 

Executive Budget Page

STATE PUBLIC WORKS BOARD

Appendix 12 - 14

Daniel K. O’Brien, Manager

 

Project No.                           Project Description

Cost

Department of Motor Vehicles

 

C02            North LV DMV:  FF & E        

$      974,403

Division of Forestry

 

M05     Indian Springs Camp Upgrade

$       87,166

M27     Las Vegas Native Plant Nursery Renovation

$    474,995 a.

M28     Kyle Canyon Fire Station Upgrades

$       96,930 a.

P18            Kyle Canyon Fire Station Feasibility Study

$       44,100

Department of Corrections

 

C20b    High Desert State Prison Phase IV, 3 Housing Units

$   58,570,649 a.

M06     High Desert State Prison Install Generator No. 4

$    532,738

M13     Nevada State Prison Install Backflow Preventors

$    188,047

M14     Silver Springs Conservation Camp Expand Sewage Leachfield

$    598,929

M15     Ely State Prison Sewage Treatment Upgrades

$     3,102,880 a.

M16     Pioche Conservation Camp Sewage Disposal Upgrades

$      234,467

M17     Indian Springs Sewage Disposal

$     2,658,136

M18     Ely State Prison Replace Air Handling Units – Phase 1

$     3,781,902

M19     Northern Nevada Correctional Center Phone Cable Replacement

$        146,649 a.

M22     Lovelock Correctional Center Central Boiler Plant Renovation

$        337,999 a.

M24     Warm Springs Correctional Center Locks, Doors, Control Panel and Intercom

$      513,173 a.

M25     Southern Desert Correctional Center Doors, Locks and Control Panels

$      406,599 a.

M29     Carlin Conservation Camp Groundwater Protection

$      599,874 a.

M30     Lovelock Correctional Center Building Structural Remediation

$        313,747 a.

M31     Southern Desert Correctional Center Boiler Replacement

$      397,421 a.

M36     Lovelock Correctional Center Central Chiller Plant Renovation

$     1,122,864 a.

M37     Ely State Prison Replace High Mast Cable System and Operators

$      454,465 a.

M38     Warm Springs Correctional Center Boiler Replacement

$      205,547 a.

M40     Lovelock Correctional Center Repair Perimeter Fence

$          56,056 a.

P01            Arsenic Reduction in Domestic Water, Humboldt and Silver Springs Camps

$          65,599

P02            Southern Desert Correctional Center Water Line Replacement

$        488,297

P03            High Desert State Prison Erosion Control

$        61,718

P05            Southern Nevada Women’s Re-entry Center – Advance Planning

$     1,246,100

P07            New Prison No. 8 Advance Planning, Indian Springs

$     1,800,000

P12            Advance Planning, Corrections Statewide Utilization Plan

$        363,189

P28            Indian Springs Work Center – Advance Planning

$     1,970,385

a.  Project cost under review for possible revision by State Public Works Board